Question 71 Choose 1
The following extract from a decision tree has been prepared for a decision that is to be made to choose between options P, Q and R.



What is the maximum expected value of profit at decision point Z?
Show answerHide answer

Correct answer: A $4 million

Question 72 Choose 1
When classifying quality costs, which of the following is NOT likely to be an appraisal cost?
Show answerHide answer

Correct answer: A Cost of product liability insurance

Question 73 Choose 1
A company is considering the use of Material V in a special order.

The material is used regularly and a sufficient quantity of the material is in inventory. It could also be sold, at just below the current market price, to a local competitor.

What is the relevant cost of Material V to be used in the special contract?
Show answerHide answer

Correct answer: A The replacement cost of the material.

Question 74 Choose 1
A manager is deciding which one of four services to provide next period.

The contribution earned by each service will depend on the weather conditions as follows.



Using the maximin criterion, which service will the manager provide?
Show answerHide answer

Correct answer: D Service S

Question 75 Choose 1
A clinic offers two types of procedure, A and B.

The clinic uses activity-based costing. The general facility overhead cost for next year is budgeted to be $8,601,600. The cost driver is the length of patient stay.
Additional data:



What is the general facility overhead cost for each Procedure B?
Show answerHide answer

Correct answer: B $3,072

Question 76
A company currently uses a rate of $32 per machine hour to absorb its total production overheads of $960,000.
Using this system the production overhead cost per unit of product X is $160.
An activity based costing exercise has revealed that only $345,000 of the production overhead is driven by machine hours. The remainder is driven by the number of machine set ups, at a rate of $9.60 per set up. Product X requires 3 set ups per unit.
Calculate the total production overhead cost per unit of product X using an activity based costing system.
Give your answer to two decimal places.
Show answerHide answer

Explanation

Answer: $86.30
Question 77 Choose 1
ABC uses an activity-based costing system. The company manufactures three products, details of which are given below:



Total material movement costs for the period are $10,000.
The material movement cost per unit for Product Z (to the nearest $0.01) is:
Show answerHide answer

Correct answer: A $10.67

Question 78 Choose 2
Petco's material price standard was £8 per kg.
When looking over their accounts you calculate that in fact they they purchased 2,000kg at £6 per kg due to an overly abundant harvest that lowered global pet food prices.
You have been asked by your manager to analyse these figures and come to a conclusion. With that in mind which of the following statements are correct? Select ALL that apply.
Show answerHide answer

Correct answer: B, D The material price planning variance is £4,000 Management had no control over this variance

That's the last free question

You've seen the free 30% (78 of 260 questions). Full access unlocks every question and full-length P1 mock exams (65 questions, 105 minutes), a different mock on every attempt.

Unlock full mock exam
Full mock exam

Sit the P1 exam before exam day

Full-length mocks with the same number of questions and the same time limit as the real P1 exam. Every attempt draws a new set of questions from the full bank, so you can keep going until you pass comfortably.

Get full P1 mock exam
  • 65questions per mock
  • 105 mintime limit
  • 260questions in the bank
  • Newmock on every attempt