Projects are separated into phases or subprojects; these phases include:
Show answerHide answer
Correct answer: A
feasibility study, concept development, design, and prototype.
Certified Associate in Project Management
Free CAPM questions on Topic 5, Volume E, each with the answer and an explanation.
20 questions · 33 minutes · free, no sign-up
Projects are separated into phases or subprojects; these phases include:
Correct answer: A
feasibility study, concept development, design, and prototype.
In which type of contract are the performance targets established at the onset and the final
contract price determined after completion of all work based on the sellers performance?
Correct answer: C
Fixed-Price-Incentive-Fee (FPIF)
Which of the following is an input to the Develop Project Charter process?
Correct answer: C
Business case
The diagram below is an example of a:
Correct answer: A
Risk breakdown structure (RBS).
Who is responsible for initiating a project?
Correct answer: A
Project sponsor
Which type of diagram includes groups of information and shows relationships between factors,
causes, and objectives?
Correct answer: D
Matrix
Activity cost estimates are quantitative assessments of the probable costs required to:
Correct answer: B
Complete project work.
The item that provides more detailed descriptions of the components in the work breakdown
structure (WB5) is called a WBS:
Correct answer: A
dictionary.
How should a stakeholder who is classified as high power and low interest be grouped in a
power/interest grid during stakeholder analysis?
Correct answer: A
Keep satisfied
The project has a current cost performance index of 0.80. Assuming this performance wi continue,
the new estimate at completion is $1000. What was the original budget at completion for the
project?
Correct answer: A
$800
You've seen the free 30% (30 of 103 questions). Full access unlocks every question and full-length CAPM mock exams (65 questions, 105 minutes), a different mock on every attempt.
Full-length mocks with the same number of questions and the same time limit as the real CAPM exam. Every attempt draws a new set of questions from the full bank, so you can keep going until you pass comfortably.