VMware certification · Exam 3V0-22.25

3V0-22.25 Mock Exam

Advanced VMware Cloud Foundation 9.0 Operations

Free 3V0-22.25 questions on Manage VCF Capacity with VCF Operations, each with the answer and an explanation.

19 questions · 43 minutes · free, no sign-up

Manage VCF Capacity with VCF Operations questions

1–2 of 2 free
Question 1 Choose 1
An administrator has been tasked with configuring a VCF Operations policy to enable a more conservative capacity modelling. When setting the Risk Level Configuration, what is the time remaining metric based on?
Show answerHide answer

Correct answer: D Upper Bounds Projection of Capacity Utilization

Explanation

Explanation:

When you configure a Conservative risk level in VCF Operations (formerly VMware Aria Operations), the capacity engine calculates the "Time Remaining" metric—the number of days until projected utilization crosses the usable capacity threshold—using the upper bound projection of capacity utilization .

The capacity engine analyzes historical utilization data and projects a future workload range that includes both an upper bound projection and a lower bound projection . The upper bound represents the high-end estimate based on historical utilization peaks. For Conservative risk levels (designed for production and mission-critical workloads), the engine explicitly uses this upper bound projection to provide a cautious forecast that helps prevent unexpected capacity exhaustion . As documented, "The engine considers the upper bound projection for a conservative risk level" .

Conversely, for Aggressive risk levels (used for non-critical workloads), the engine uses the mean (average) of the upper and lower bound projections .

Why Other Options Are Incorrect

A (Actual Projection of Available Capacity Mean) & B (Actual Projection of Capacity Utilization Mean)
– The mean projection is specifically used for Aggressive risk levels, not Conservative . Selecting the mean would underestimate future demand and risk capacity shortages.

C (Lower Bounds Projection of Capacity Utilization)
– This represents the most optimistic forecast, ignoring historical utilization peaks. Using it would dangerously underestimate future resource consumption, contradicting the purpose of a conservative policy .

Reference:

Broadcom TechDocs: How Does VCF Operations Calculate and Forecast Capacity (VCF 9.0) ; Capacity Details
Question 2 Choose 2
A VM named acme001 is listed in the Rightsize oversized list with a default recommendation of a 2 vCPU reduction and also in the undersized list with a default recommendation of a 2 GB memory increase. The administrator schedules the oversized vCPU reduction, then excludes the VM from the undersized list, then schedules scale-up for the remaining undersized VMs. What are the two results for acme001? (Choose two.)
Show answerHide answer

Correct answer: D, E The acme001 VM is reduced by 2 vCPU The acme001 VM memory is not changed

Explanation

Explanation:

The administrator executes optimization steps in a specific sequential order, yielding these exact results:

vCPU Reduction (Result D):The administrator explicitly schedules the oversized vCPU reduction while acme001 is actively on that list. VCF Operations registers this action item. Once the scheduled maintenance window occurs, the engine passes the API call to vCenter Server to decrease the allocation by 2 vCPUs.

Memory Remains Unchanged (Result E):
The administrator manually adds acme001 to the exclusion list for the undersized category before running or scheduling mass modifications. When the bulk scale-up action is subsequently initiated for the "remaining undersized VMs," the engine evaluates exclusions, skips acme001, and applies no memory modifications to it.

Why Other Options Are Incorrect

A and B are incorrect: The 2 GB memory increase is blocked entirely because the VM was successfully removed from the targeting scope via the exclusion action prior to the bulk scale-up scheduling.

C is incorrect:The vCPU configuration is altered because the reduction job was queued and committed before any changes were made to the VM's exclusion statuses.

References

VMware Cloud Foundation 9.0 Workload Optimization Guide: Managing Right-Sizing Recommendations -> Excluding Infrastructure Objects from Active Resource Actions.

VMware Aria Operations User Guide: Optimizing Capacity and Performance -> Automating and Scheduling Resize Actions.

That's the last free question in Manage VCF Capacity with VCF Operations

You've seen the free 30% (2 of 7 questions). Full access unlocks every question and full-length 3V0-22.25 mock exams (60 questions, 135 minutes), a different mock on every attempt.

Unlock full mock exam
Full mock exam

Sit the 3V0-22.25 exam before exam day

Full-length mocks with the same number of questions and the same time limit as the real 3V0-22.25 exam. Every attempt draws a new set of questions from the full bank, so you can keep going until you pass comfortably.

Get full 3V0-22.25 mock exam
  • 60questions per mock
  • 135 mintime limit
  • 60questions in the bank
  • Newmock on every attempt