Question 41 Choose 1

Which of the following is NOT a part of a risk analysis?

Show answerHide answer

Correct answer: D

Choose the best countermeasure

Explanation

This step is not a part of RISK ANALYSIS.
A risk analysis has three main goals: identify risks, quantify the impact of potential threats,
and provide an economic balance between the impact of the risk and the cost of the
associated countermeasure. Choosing the best countermeasure is not part of the risk
analysis.
Source: HARRIS, Shon, All-In-One CISSP Certification Exam Guide, McGraw-
Hill/Osborne, 2002, chapter 3: Security Management Practices (page 73).
HARRIS, Shon, Mike Meyers' CISSP(R) Certification Passport, 2002, McGraw-Hill, page
12.

Question 42 Choose 1

Which of the following questions is less likely to help in assessing an organization's
contingency planning controls?

Show answerHide answer

Correct answer: A

 Is damaged media stored and/or destroyed?


Explanation

Contingency planning involves more than planning for a move offsite after a
disaster destroys a facility.
It also addresses how to keep an organization's critical functions operating in the event of
disruptions, large and small.
Handling of damaged media is an operational task related to regular production and is not
specific to contingency planning.
Source: SWANSON, Marianne, NIST Special Publication 800-26, Security Self-
Assessment Guide for Information Technology Systems, November 2001 (Pages A-27 to
A-28).

Question 43 Choose 1

For which areas of the enterprise are business continuity plans required?

Show answerHide answer

Correct answer: A

All areas of the enterprise.

Explanation

Source: TIPTON, Hal, (ISC)2, Introduction to the CISSP Exam presentation. 

Question 44 Choose 1

Which of the following rules pertaining to a Business Continuity Plan/Disaster Recovery
Plan is incorrect?

Show answerHide answer

Correct answer: A

In order to facilitate recovery, a single plan should cover all locations.

Explanation

The first documentation rule when it comes to a BCP/DRP is "one plan, one
building". Much of the plan revolves around reconstructing a facility and replenishing it with
production contents. If more than one facility is involved, then the reader of the plan will find
it difficult to identify quantities and specifications of replacement resource items. It is
possible to have multiple plans for a single building, but those plans must be linked so that
the identification and ordering of resource items is centralized. All other statements are
correct.
Source: BARNES, James C. & ROTHSTEIN, Philip J., A Guide to Business Continuity
Planning, John Wiley & Sons, 2001 (page 162).

Question 45 Choose 1

Which of the following is the most complete disaster recovery plan test type, to be
performed after successfully completing the Parallel test?

Show answerHide answer

Correct answer: A

Full Interruption test

Explanation

The difference between this and the full-interruption test is that the primary
production processing of the business does not stop; the test processing runs in parallel to
the real processing. This is the most common type of disaster recovery plan testing.
A checklist test is only considered a preliminary step to a real test.
In a structured walk-through test, business unit management representatives meet to walk
through the plan, ensuring it accurately reflects the organization's ability to recover
successfully, at least on paper.
A simulation test is aimed at testing the ability of the personnel to respond to a simulated
disaster, but not recovery process is actually performed.
Source: KRUTZ, Ronald L. & VINES, Russel D., The CISSP Prep Guide: Mastering the
Ten Domains of Computer Security, John Wiley & Sons, 2001, Chapter 8: Business
Continuity Planning and Disaster Recovery Planning (page 289).

Question 46 Choose 1

Which of the following steps is NOT one of the eight detailed steps of a Business Impact
Assessment (BIA):

Show answerHide answer

Correct answer: A

Notifying senior management of the start of the assessment.

Explanation

Source: HARRIS, S., CISSP All- In-One Exam Guide, 3rd. Edition, 2005,
Chapter 9, Page 701.
There have been much discussion about the steps of the BIA and I struggled with this
before deciding to scrape the question about "the four steps," and re-write the question
using the AIO for a reference. This question should be easy.... if you know all eight steps.
The eight detailed and granular steps of the BIA are:
1. Select Individuals to interview for the data gathering.
2. Create data gathering techniques (surveys, questionnaires, qualitative and quantitative
approaches).
3. Identify the company's critical business functions.
4. Identify the resources that these functions depend upon.
5. Calculate how long these functions can survive without these resources.
6. Identify vulnerabilities and the threats to these functions.
7. Calculate risk for each of the different business functions.
8. Document findings and report them to management.
Shon goes on to cover each step in Chapter 9.

Question 47 Choose 1

Which of the following specifically addresses cyber attacks against an organization's IT
systems?

Show answerHide answer

Correct answer: C

 Incident response plan

Explanation

The incident response plan focuses on information security responses to
incidents affecting systems and/or networks. It establishes procedures to address cyber
attacks against an organization's IT systems. These procedures are designed to enable
security personnel to identify, mitigate, and recover from malicious computer incidents,
such as unauthorized access to a system or data, denial of service, or unauthorized
changes to system hardware or software. The continuity of support plan is the same as an
IT contingency plan. It addresses IT system disruptions and establishes procedures for
recovering a major application or general support system. It is not business process
focused. The business continuity plan addresses business processes and provides
procedures for sustaining essential business operations while recovering from a significant
disruption. The continuity of operations plan addresses the subset of an organization's
missions that are deemed most critical and procedures to sustain these functions at an
alternate site for up to 30 days.
Source: SWANSON, Marianne, & al., National Institute of Standards and Technology
(NIST), NIST Special Publication 800-34, Contingency Planning Guide for Information
Technology Systems, December 2001 (page 8).

Question 48 Choose 1

Which of the following computer recovery sites is only partially equipped with processing
equipment?

Show answerHide answer

Correct answer: C

warm site

Explanation

A warm site has some basic equipment or in some case almost all of the
equipment but it is not sufficient to be operational without bringing in the last backup and in
some cases more computers and other equipment.
The following answers are incorrect:
hot site. Is incorrect because a hot-site is fully configured with all the required hardware.
The only thing missing is the last backup and you are up and running.Rolling hot site. Is incorrect because a rolling hot-site is fully configured with all the required
hardware.
cold site. Is incorrect because a cold site has basically power, HVAC, basic cabling, but no
or little as far as processing equipment is concerned. All other equipment must be brought
to this site. It might take a week or two to reconstruct.
References:
OIG CBK Business Continuity and Disaster Recovery Planning (pages 368 - 369)

Question 49 Choose 1

What is the Maximum Tolerable Downtime (MTD)?

Show answerHide answer

Correct answer: D

It is maximum delay businesses can tolerate and still remain viable

Explanation

The Maximum Tolerable Downtime (MTD) is the maximum length of time a
BUSINESS FUNCTION can endure without being restored, beyond which the BUSINESS
is no longer viable
NIST SAYS:
The ISCP Coordinator should analyze the supported mission/business processes and with
the process owners, leadership and business managers determine the acceptable
downtime if a given process or specific system data were disrupted or otherwise
unavailable. Downtime can be identified in several ways.
Maximum Tolerable Downtime (MTD). The MTD represents the total amount of time the
system owner/authorizing official is willing to accept for a mission/business process outage
or disruption and includes all impact considerations. Determining MTD is important
because it could leave contingency planners with imprecise direction on selection of an
appropriate recovery method, and the depth of detail which will be required when developing recovery procedures, including their scope and content.
Other BCP and DRP terms you must be familiar with are:
Recovery Time Objective (RTO). RTO defines the maximum amount of time that a system
resource can remain unavailable before there is an unacceptable impact on other system
resources, supported mission/business processes, and the MTD. Determining the
information system resource RTO is important for selecting appropriate technologies that
are best suited for meeting the MTD. When it is not feasible to immediately meet the RTO
and the MTD is inflexible, a Plan of Action and Milestone should be initiated to document
the situation and plan for its mitigation.
Recovery Point Objective (RPO). The RPO represents the point in time, prior to a
disruption or system outage, to which mission/business process data can be recovered
(given the most recent backup copy of the data) after an outage. Unlike RTO, RPO is not
considered as part of MTD. Rather, it is a factor of how much data loss the
mission/business process can tolerate during the recovery process. Because the RTO
must ensure that the MTD is not exceeded, the RTO must normally be shorter than the
MTD. For example, a system outage may prevent a particular process from being
completed, and because it takes time to reprocess the data, that additional processing time
must be added to the RTO to stay within the time limit established by the MTD.
References used for this question:
KRUTZ, Ronald L. & VINES, Russel D., The CISSP Prep Guide: Mastering the Ten
Domains of Computer Security, John Wiley & Sons, 2001, Page 276.
and
http://csrc.nist.gov/publications/nistpubs/800-34-rev1/sp800-34-rev1_errata-Nov11-
2010.pdf

Question 50 Choose 1

What is electronic vaulting?

Show answerHide answer

Correct answer: D

A transfer of bulk information to a remote central backup facility

Explanation

Electronic vaulting is defined as "a method of transferring bulk information to
off-site facilities for backup purposes". Remote Journaling is the same concept as
electronic vaulting, but has to do with journals and transaction logs, not the actual files.
Source: HARRIS, Shon, All-In-One CISSP Certification Exam Guide, McGraw-
Hill/Osborne, 2002, chapter 9: Disaster Recovery and Business continuity (page 619).

Full mock exam

Sit the SSCP exam before exam day

Full-length mocks with the same number of questions and the same time limit as the real SSCP exam. Every attempt draws a new set of questions from the full bank, so you can keep going until you pass comfortably.

Get full SSCP mock exam
  • 65questions per mock
  • 105 mintime limit
  • 1,048questions in the bank
  • Newmock on every attempt