ISC certification · Exam SSCP

SSCP Mock Exam

System Security Certified Practitioner

Free SSCP questions on topic 4.Risk,Response and Recovery, each with the answer and an explanation.

20 questions · 33 minutes · free, no sign-up

topic 4.Risk,Response and Recovery questions

1–10 of 54 free
Question 1 Choose 1

What is the most correct choice below when talking about the steps to resume normal
operation at the primary site after the green light has been given by the salvage team?

Show answerHide answer

Correct answer: C

The least critical functions should be moved back first

Explanation

It's interesting to note that the steps to resume normal processing operations
will be different than the steps of the recovery plan; that is, the least critical work should be
brought back first to the primary site.
The most important point above in the steps would be to move the least critical items or
resources back to the primary site first. This way you can ensure that the site was really
well prepared and that all is working fine.
Before that first step would be done, you would get the green light from the salvage team
that it is fine to move back to the primary site. The first step after getting the green light
would be to move the least critical elements first.
As stated in the Shon Harris book:The least critical functions should be moved back first, so if there are issues in network
configurations or connectivity, or important steps were not carried out, the critical
operations of the company are not negatively affected. Why go through the trouble of
moving the most critical systems and operations to a safe and stable site, only to return it to
a main site that is untested? Let the less critical departments act as the canary. If they
survive, then move over the more critical components of the company.
When it is time for the company to move back into its original site or a new site, the
company enters the reconstitution phase. A company is not out of an emergency state until
it is back in operation at the original primary site or a new site that was constructed to
replace the primary site, because the company is always vulnerable while operating in a
backup facility.
Many logistical issues need to be considered as to when a company must return from the
alternate site to the original site. The following lists a few of these issues:
Ensuring the safety of employees
Ensuring an adequate environment is provided (power, facility infrastructure, water, HVAC)
Ensuring that the necessary equipment and supplies are present and in working order
Ensuring proper communications and connectivity methods are working
Properly testing the new environment
Once the coordinator, management, and salvage team sign off on the readiness of the
facility, the salvage team should carry out the following steps:
Back up data from the alternate site and restore it within the new facility.
Carefully terminate contingency operations.
Securely transport equipment and personnel to the new facility.
All other choices are not the correct answer.
Reference(s) used for this question:
Harris, Shon (2012-10-25). CISSP All-in-One Exam Guide, 6th Edition (Kindle Location
19389). McGraw-Hill. Kindle Edition.
and
KRUTZ, Ronald L. & VINES, Russel D., The CISSP Prep Guide: Mastering the Ten
Domains of Computer Security, John Wiley & Sons, 2001, Page 290.

Question 2 Choose 1

Which of the following item would best help an organization to gain a common
understanding of functions that are critical to its survival?

Show answerHide answer

Correct answer: D

A business impact analysis

Explanation

A Business Impact Analysis (BIA) is an assessment of an organization's
business functions to develop an understanding of their criticality, recovery time objectives,
and resources needed.
By going through a Business Impact Analysis, the organization will gain a common
understanding of functions that are critical to its survival.
A risk assessment is an evaluation of the exposures present in an organization's external
and internal environments.
A Business Assessment generally include Business Analysis as a discipline and it has
heavy overlap with requirements analysis sometimes also called requirements engineering,
but focuses on identifying the changes to an organization that are required for it to achieve
strategic goals. These changes include changes to strategies, structures, policies,
processes, and information systems.
A disaster recovery plan is the comprehensive statement of consistent actions to be taken
before, during and after a disruptive event that causes a significant loss of information
systems resources.
Source: BARNES, James C. & ROTHSTEIN, Philip J., A Guide to Business Continuity
Planning, John Wiley & Sons, 2001 (page 57).

Question 3 Choose 1

Which common backup method is the fastest on a daily basis?

Show answerHide answer

Correct answer: B

Incremental backup method

Explanation

The incremental backup method only copies files that have been recently
changed or added. Only files with their archive bit set are backed up. This method is fast
and uses less tape space but has some inherent vulnerabilities, one being that all
incremental backups need to be available and restored from the date of the last full backup
to the desired date should a restore be needed.
Source: KRUTZ, Ronald L. & VINES, Russel D., The CISSP Prep Guide: Mastering the
Ten Domains of Computer Security, John Wiley & Sons, 2001, Chapter 3:
Telecommunications and Network Security (page 69).

Question 4 Choose 1

Which backup method does not reset the archive bit on files that are backed up?

Show answerHide answer

Correct answer: C

Differential backup method

Explanation

The differential backup method only copies files that have changed since the
last full backup was performed. It is additive in the fact that it does not reset the archive bit
so all changed or added files are backed up in every differential backup until the next full
backup. The "additive backup method" is not a common backup method.
Source: KRUTZ, Ronald L. & VINES, Russel D., The CISSP Prep Guide: Mastering the
Ten Domains of Computer Security, John Wiley & Sons, 2001, Chapter 3:
Telecommunications and Network Security (page 69).

Question 5 Choose 1

Which of the following is the most critical item from a disaster recovery point of view?

Show answerHide answer

Correct answer: A

Data

Explanation

The most important point is ALWAYS the data. Everything else can be
replaced or repaired.
Data MUST be backed up, backups must be regularly tested, because once it is truly lost, it
is lost forever.
The goal of disaster recovery is to minimize the effects of a disaster or disruption. It means
taking the necessary steps to ensure that the resources, personnel, and business
processes are able to resume operation in a timely manner . This is different from
continuity planning, which provides methods and procedures for dealing with longer-term
outages and disasters.
The goal of a disaster recovery plan is to handle the disaster and its ramifications right after
the disaster hits; the disaster recovery plan is usually very information technology (IT)–
focused. A disaster recovery plan (DRP) is carried out when everything is still in emergency
mode, and everyone is scrambling to get all critical systems back online.
Reference(s) used for this question:
Harris, Shon (2012-10-18). CISSP All-in-One Exam Guide, 6th Edition (p. 887). McGraw-
Hill. Kindle Edition.
and
Veritas eLearning CD - Introducing Disaster Recovery Planning, Chapter 1

Question 6 Choose 1

What can be defined as a batch process dumping backup data through communications
lines to a server at an alternate location?

Show answerHide answer

Correct answer: B

Electronic vaulting

Explanation

Explanation: Electronic vaulting refers to the transfer of backup data to an off-site location.
This is primarily a batch process of dumping backup data through communications lines to
a server at an alternate location.
Electronic vaulting is accomplished by backing up system data over a network. The backup
location is usually at a separate geographical location known as the vault site. Vaulting can
be used as a mirror or a backup mechanism using the standard incremental or differential
backup cycle. Changes to the host system are sent to the vault server in real-time when the
backup method is implemented as a mirror. If vaulting updates are recorded in real-time,
then it will be necessary to perform regular backups at the off-site location to provide
recovery services due to inadvertent or malicious alterations to user or system data.
The following are incorrect answers:
Remote journaling refers to the parallel processing of transactions to an alternate site (as
opposed to a batch dump process). Journaling is a technique used by database
management systems to provide redundancy for their transactions. When a transaction is
completed, the database management system duplicates the journal entry at a remote
location. The journal provides sufficient detail for the transaction to be replayed on the
remote system. This provides for database recovery in the event that the database
becomes corrupted or unavailable.
Database shadowing uses the live processing of remote journaling, but creates even more
redundancy by duplicating the database sets to multiple servers. There are also additional
redundancy options available within application and database software platforms. For
example, database shadowing may be used where a database management system
updates records in multiple locations. This technique updates an entire copy of the
database at a remote location.
Data clustering refers to the classification of data into groups (clusters). Clustering may
also be used, although it should not be confused with redundancy. In clustering, two or
more “partners” are joined into the cluster and may all provide service at the same time.
For example, in an active–active pair, both systems may provide services at any time. In
the case of a failure, the remaining partners may continue to provide service but at a
decreased capacity.The following resource(s) were used for this question:
Hernandez CISSP, Steven (2012-12-21). Official (ISC)2 Guide to the CISSP CBK, Third
Edition ((ISC)2 Press) (Kindle Locations 20403-20407 and 20411-20414 and 20375-20377
and 20280-20283). Auerbach Publications. Kindle Edition.

Question 7 Choose 1

What assesses potential loss that could be caused by a disaster?

Show answerHide answer

Correct answer: B

The Business Impact Analysis (BIA)

Explanation

The Business Assessment is divided into two components. Risk Assessment
(RA) and Business Impact Analysis (BIA). Risk Assessment is designed to evaluate
existing exposures from the organization's environment, whereas the BIA assesses
potential loss that could be caused by a disaster. The Business Continuity Plan's goal is to
reduce the risk of financial loss by improving the ability to recover and restore operations
efficiently and effectively.
Source: BARNES, James C. & ROTHSTEIN, Philip J., A Guide to Business Continuity
Planning, John Wiley & Sons, 2001 (page 57).
And: KRUTZ, Ronald L. & VINES, Russel D., The CISSP Prep Guide: Mastering the Ten
Domains of Computer Security, John Wiley & Sons, 2001, Chapter 8: Business Continuity
Planning and Disaster Recovery Planning (page 276).

Question 8 Choose 1

Which of the following statements pertaining to disaster recovery planning is incorrect?

Show answerHide answer

Correct answer: A

Every organization must have a disaster recovery plan

Explanation

It is possible that an organization may not need a disaster recovery plan. An
organization may not have any critical processing areas or system and they would be able
to withstand lengthy interruptions.
Remember that DRP is related to systems needed to support your most critical business
functions.
The DRP plan covers actions to be taken when a disaster occur but DRP PLANNING
which is the keywork in the question would also include steps that happen before you use
the plan such as development of the plan, training, drills, logistics, and a lot more.
To be effective, the plan would certainly cover before, during, and after the disaster actions.
It may take you a couple years to develop a plan for a medium size company, there is a lot
that has to happen before the plan would be actually used in a real disaster scenario. Plan
for the worst and hope for the best.
All other statements are true.
NOTE FROM CLEMENT:
Below is a great article on who legally needs a plan which is very much in line with this
question. Does EVERY company needs a plan? The legal answer is NO. Some
companies, industries, will be required according to laws or regulations to have a plan. A
blank statement saying: All companies MUST have a plan would not be accurate. The
article below is specific to the USA but similar laws will exist in many other countries.
Some companies such as utilities, power, etc... might also need plan if they have been
defined as Critical Infrastructure by the government. The legal side of IT is always very
complex and varies in different countries. Always talk to your lawyer to ensure you follow
the law of the land :-)
Read the details below:So Who, Legally, MUST Plan?
With the caveats above, let’s cover a few of the common laws where there is a duty to have
a disaster recovery plan. I will try to include the basis for that requirement, where there is
an implied mandate to do so, and what the difference is between the two
Banks and Financial Institutions MUST Have a Plan
The Federal Financial Institutions Examination Council (Council) was established on March
10, 1979, pursuant to Title X of the Financial Institutions Regulatory and Interest Rate
Control Act of 1978 (FIRA), Public Law 95-630. In 1989, Title XI of the Financial Institutions
Reform, Recovery and Enforcement Act of 1989 (FIRREA) established the Examination
Council (the Council).
The Council is a formal interagency body empowered to prescribe uniform principles,
standards, and report forms for the federal examination of financial institutions by the Board
of Governors of the Federal Reserve System (FRB), the Federal Deposit Insurance
Corporation (FDIC), the National Credit Union Administration (NCUA), the Office of the
Comptroller of the Currency (OCC), and the Office of Thrift Supervision (OTS); and to
make recommendations to promote uniformity in the supervision of financial institutions. In
other words, every bank, savings and loan, credit union, and other financial institution is
governed by the principles adopted by the Council.
In March of 2003, the Council released its Business Continuity Planning handbook
designed to provide guidance and examination procedures for examiners in evaluating
financial institution and service provider risk-management processes.
Stockbrokers MUST Have a Plan
The National Association of Securities Dealers (NASD) has adopted rules that require all its
members to have business continuity plans. The NASD oversees the activities of more
than 5,100 brokerage firms, approximately 130,800 branch offices and more than 658,770
registered securities representatives.
As of June 14, 2004, the rules apply to all NASD member firms. The requirements, which
are specified in Rule 3510, begin with the following:
3510. Business Continuity Plans. (a) Each member must create and maintain a written
business continuity plan identifying procedures relating to an emergency or significant
business disruption. Such procedures must be reasonably designed to enable the member
to meet its existing obligations to customers. In addition, such procedures must address the
member’s existing relationships with other broker-dealers and counter-parties. Thebusiness continuity plan must be made available promptly upon request to NASD staff.
NOTE:
The rules apply to every company that deals in securities, such as brokers, dealers, and
their representatives, it does NOT apply to the listed companies themselves.
Electric Utilities WILL Need a Plan
The disaster recovery function relating to the electric utility grid is presently undergoing a
change. Prior to 2005, the Federal Energy Regulatory Commission (FERC) could only
coordinate volunteer efforts between utilities. This has changed with the adoption of Title
XII of the Energy Policy Act of 2005 (16 U.S.C. 824o). That new law authorizes the FERC
to create an Electric Reliability Organization (ERO).
The ERO will have the capability to adopt and enforce reliability standards for "all users,
owners, and operators of the bulk power system" in the United States. At this time, FERC
is in the process of finalizing the rules for the creation of the ERO. Once the ERO is
created, it will begin the process of establishing reliability standards.
It is very safe to assume that the ERO will adopt standards for service restoration and
disaster recovery, particularly after such widespread disasters as Hurricane Katrina.
Telecommunications Utilities SHOULD Have Plans, but MIGHT NOT
Telecommunications utilities are governed on the federal level by the Federal
Communications Commission (FCC) for interstate services and by state Public Utility
Commissions (PUCs) for services within the state.
The FCC has created the Network Reliability and Interoperability Council (NRIC). The role
of the NRIC is to develop recommendations for the FCC and the telecommunications
industry to "insure [sic] optimal reliability, security, interoperability and interconnectivity of,
and accessibility to, public communications networks and the internet." The NRIC members
are senior representatives of providers and users of telecommunications services and
products, including telecommunications carriers, the satellite, cable television, wireless and
computer industries, trade associations, labor and consumer representatives,
manufacturers, research organizations, and government-related organizations.
There is no explicit provision that we could find that says telecommunications carriers must
have a Disaster Recovery Plan. As I have stated frequently in this series of articles on
disaster recovery, however, telecommunications facilities are tempting targets for terrorism.
I have not changed my mind in that regard and urge caution.You might also want to consider what the liability of a telephone company is if it does havea disaster that causes loss to your organization. In three words: It’s not much. The following
is the statement used in most telephone company tariffs with regard to its liability:
The Telephone Company’s liability, if any, for its gross negligence or willful misconduct is
not limited by this tariff. With respect to any other claim or suit, by a customer or any
others, for damages arising out of mistakes, omissions, interruptions, delays or errors, or
defects in transmission occurring in the course of furnishing services hereunder, the
Telephone Company’s liability, if any, shall not exceed an amount equivalent to the
proportionate charge to the customer for the period of service during which such mistake,
omission, interruption, delay, error or defect in transmission or service occurs and
continues. (Source, General Exchange Tariff for major carrier)
All Health Care Providers WILL Need a Disaster Recovery Plan
HIPAA is an acronym for the Health Insurance Portability and Accountability Act of 1996,
Public Law 104-191, which amended the Internal Revenue Service Code of 1986. Also
known as the Kennedy-Kassebaum Act, the Act includes a section, Title II, entitled
Administrative Simplification, requiring "Improved efficiency in healthcare delivery by
standardizing electronic data interchange, and protection of confidentiality and security of
health data through setting and enforcing standards."
The legislation called upon the Department of Health and Human Services (HHS) to
publish new rules that will ensure security standards protecting the confidentiality and
integrity of "individually identifiable health information," past, present, or future.
The final Security Rule was published by HHS on February 20, 2003 and provides for a
uniform level of protection of all health information that is housed or transmitted
electronically and that pertains to an individual.
The Security Rule requires covered entities to ensure the confidentiality, integrity, and
availability of all electronic protected health information (ePHI) that the covered entity
creates, receives, maintains, or transmits. It also requires entities to protect against any
reasonably anticipated threats or hazards to the security or integrity of ePHI, protect
against any reasonably anticipated uses or disclosures of such information that are not
permitted or required by the Privacy Rule, and ensure compliance by their workforce.
Required safeguards include application of appropriate policies and procedures,
safeguarding physical access to ePHI, and ensuring that technical security measures are in
place to protect networks, computers and other electronic devices.
Companies with More than 10 EmployeesThe United States Department of Labor has adopted numerous rules and regulations in
regard to workplace safety as part of the Occupational Safety and Health Act. For example,
29 USC 654 specifically requires:
(a) Each employer:
(1) shall furnish to each of his employees employment and a place of employment which
are free from recognized hazards that are causing or are likely to cause death or serious
physical harm to his employees;
(2) shall comply with occupational safety and health standards promulgated under this Act.
(b) Each employee shall comply with occupational safety and health standards and all
rules, regulations, and orders issued pursuant to this Act which are applicable to his own
actions and conduct.
Other Considerations or Expensive Research QUESTION NO: s for Lawyers (Sorry,
Eddie!)
The Foreign Corrupt Practices Act of 1977
Internal Revenue Service (IRS) Law for Protecting Taxpayer Information
Food and Drug Administration (FDA) Mandated Requirements
Homeland Security and Terrorist Prevention
Pandemic (Bird Flu) Prevention
ISO 9000 Certification
Requirements for Radio and TV Broadcasters
Contract Obligations to Customers
Document Protection and Retention Laws
Personal Identity Theft...and MORE!
Suffice it to say you will need to check with your legal department for specific requirements
in your business and industry!
I would like to thank my good friend, Eddie M. Pope, for his insightful contributions to this
article, our upcoming book, and my ever-growing pool of lawyer jokes. If you want more
information on the legal aspects of recovery planning, Eddie can be contacted at my
company or via email at mailto:mempope@tellawcomlabs.com. (Eddie cannot, of course,
give you legal advice, but he can point you in the right direction.)
I hope this article helps you better understand the complex realities of the legal reasonswhy we plan and wish you the best of luck
See original article at: http://www.informit.com/articles/article.aspx?p=777896
See another interesting article on the subject at:
http://www.informit.com/articles/article.aspx?p=677910&seqNum=1
References used for this question:
KRUTZ, Ronald L. & VINES, Russel D., The CISSP Prep Guide: Mastering the Ten
Domains of Computer Security, John Wiley & Sons, 2001, Chapter 8: Business Continuity
Planning and Disaster Recovery Planning (page 281).

Question 9 Choose 1

Which of the following recovery plan test results would be most useful to management?

Show answerHide answer

Correct answer: B

list of successful and unsuccessful activities.

Explanation

After a test has been performed the most useful test results for
manangement would be knowing what worked and what didn't so that they could correct
the mistakes where needed.
The following answers are incorrect:
elapsed time to perform various activities. This is incorrect because it is not the best
answer, these results are not as useful as list of successful and unsuccessful activities
would be to managment.
amount of work completed. This is incorrect because it is not the best answer, these results
are not as useful as list of successful and unsuccessful activities would be to managment.
description of each activity. This is incorrect because it is not the best answer, these resultsare not as useful as list of successful and unsuccessful activities would be to managment.

Question 10 Choose 1

Which of the following is less likely to accompany a contingency plan, either within the plan
itself or in the form of an appendix?

Show answerHide answer

Correct answer: A

Contact information for all personnel.

Explanation

Why is this the correct answer? Simply because it is WRONG, you would
have contact information for your emergency personnel within the plan but NOT for ALL of
your personnel. Be careful of words such as ALL.
According to NIST's Special publication 800-34, contingency plan appendices provide key
details not contained in the main body of the plan. The appendices should reflect the
specific technical, operational, and management contingency requirements of the given
system. Contact information for recovery team personnel (not all personnel) and for vendor
should be included, as well as detailed system requirements to allow for supporting of
system operations. The Business Impact Analysis (BIA) should also be included as an
appendix for reference should the plan be activated.
Reference(s) used for this question:
SWANSON, Marianne, & al., National Institute of Standards and Technology (NIST), NIST
Special Publication 800-34, Contingency Planning Guide for Information Technology
Systems

Full mock exam

Sit the SSCP exam before exam day

Full-length mocks with the same number of questions and the same time limit as the real SSCP exam. Every attempt draws a new set of questions from the full bank, so you can keep going until you pass comfortably.

Get full SSCP mock exam
  • 65questions per mock
  • 105 mintime limit
  • 1,048questions in the bank
  • Newmock on every attempt