Question 11 Choose 1
A LEED Building Design and Construction: New Construction office building's HVAC system includes hot water from a central utility plant. The central utility plant is owned and operated by a management company. The office pays a flat fee for hot water, included as part of the leas. The management company does not meter or invoice for actual hot water consumption. For the project to meet the requirements for Energy and Atmosphere Prerequisite, Building-Level Energy Metering, an energy meter must be installed for
Show answerHide answer

Correct answer: B hot water at the main service point

Explanation

Explanation: An energy meter must be installed for hot water at the main service point for the project to meet the requirements for Energy and Atmosphere Prerequisite, Building-Level Energy Metering. According to the LEED v4 BD+C Reference Guide, this prerequisite requires that “all energy sources used by the building must be metered or submetered” 1. The hot water from the central utility plant is an energy source used by the building, even if it is not directly paid by the office. Therefore, it must be metered at the point where it enters the building. The other options are incorrect because natural gas is not an energy source used by the building in this case, and the flat fee or the ownership of the energy source do not exempt the project from the metering requirement.References: LEED v4 BD+C Reference Guide, Energy and Atmosphere Category, EAp Building-Level Energy Metering, page 569.
Question 12 Choose 1
A contractor is building a retirement community project. 30% of the building's product costs were derived from reused/salvaged materials or met recycled content criteria. Which of the following credits can the LEED AP submit towards certification?
Show answerHide answer

Correct answer: A Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials

Question 13 Choose 1
The Sustainable Sites Credit, Heat Island Reduction takes into account both new and three-year aged Solar Reflectance Index (SRI) values for roofing material because
Show answerHide answer

Correct answer: B SRI generally decreases with age

Explanation

Explanation: SRI generally decreases with age The Solar Reflectance Index (SRI) is a measure of the ability of a surface to reflect solar heat, as shown by a small temperature rise. It is calculated using the values of solar reflectance and thermal emittance of the surface. The higher the SRI, the lower the heat island effect. However, SRI generally decreases with age due to factors such as weathering, dirt accumulation, and biological growth. Therefore, the Sustainable Sites Credit, Heat Island Reduction takes into account both new and three-year aged SRI values for roofing material to ensure that the material maintains a high level of reflectance over time.
Question 14 Choose 1
Under Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification, a current facilities requirements and operations and maintenance plan must contain which information necessary to operate the building efficiently?
Show answerHide answer

Correct answer: A Any changes in schedules or setpoints for different seasons, days of the week, and times of day

Explanation

Explanation: A current facilities requirements and operations and maintenance plan must contain any changes in schedules or setpoints for different seasons, days of the week, and times of day. This is to ensure that the building systems are operating efficiently and according to the design intent. The other options are too limited or too specific and do not cover all the possible variations in schedules or setpoints.References: LEED v4 BD+C Reference Guide, Energy and Atmosphere Category, EAp Fundamental Commissioning and Verification, page 569.
Question 15 Choose 1
What is the basis of energy consumption in determining the percentage of green power or carbon offsets?
Show answerHide answer

Correct answer: B Quantity

Question 16 Choose 1
When a project team sustainably develops a project site, the design should
Show answerHide answer

Correct answer: C remediate sites already in decline

Explanation

Explanation: remediate sites already in decline
When a project team sustainably develops a project site, the design should aim to remediate sites already in decline, such as brownfields, degraded lands, or abandoned properties. By doing so, the project can restore the environmental quality, ecological functions, and social value of the site, as well as reduce the pressure on undeveloped lands and natural habitats. LEED offers credits for projects that choose to locate on and remediate sites already in decline, such as the Sustainable Sites Credit, Site Assessment and the Sustainable Sites Credit, Brownfields Remediation1.
Question 17 Choose 1
A project has total waste of 20 tons (18.1 tonnes) that includes the following:

· 8 tons (7.3 tonnes) of recycled demolition steel and concrete
· 2 tons (1.8 tonnes) of trees cleared from the site
. 3 tons (2.7 tonnes) of commingled scrap with 40% diverted
. 6 tons (5.4 tonnes) of used furniture donated to a non-profit organization
· 1 ton (0.9 tonnes) of removed carpet and ceiling tiles sent back to the manufacturer

What is the percentage of diverted waste for Materials and Resources Credit, Construction and Demolition Waste Management?
Show answerHide answer

Correct answer: B 75%

Explanation

Explanation: The percentage of diverted waste for Materials and Resources Credit, Construction and Demolition Waste Management is calculated by dividing the total weight of diverted materials by the total weight of waste generated1. Diverted materials are those that are reused, recycled, salvaged, or donated2. In this case, the total weight of diverted materials is:

8 tons (7.3 tonnes) of recycled demolition steel and concrete
6 tons (5.4 tonnes) of used furniture donated to a non-profit organization
1 ton (0.9 tonnes) of removed carpet and ceiling tiles sent back to the manufacturer
40% of 3 tons (2.7 tonnes) of commingled scrap, which is 1.2 tons (1.1 tonnes)
The sum of these weights is 16.2 tons (14.7 tonnes). The total weight of waste generated is 20 tons (18.1 tonnes). Therefore, the percentage of diverted waste is:

(16.2 / 20) x 100 = 81%
However, the credit allows for a 10% adjustment for vegetative waste, which is not considered a building material3. Therefore, the percentage of diverted waste after adjustment is:

(81 - 10) = 71%
The closest answer option to this value is B. 75%.
Question 18 Choose 1
What are the Storage and Collection of Recyclables requirements for only Retail projects under the Materials and Resources Prerequisite?
Show answerHide answer

Correct answer: A What are the Storage and Collection of Recyclables requirements for only Retail projects under the Materials and Resources Prerequisite?

Explanation

Explanation: Retail projects must conduct a waste stream audit for the duration of the project in an existing location or make projections based on historical data for similar establishments. Identify the top-five recyclable waste streams while stating the top-four waste streams where both collection and storage space will be provided. This is the requirement for Retail projects under the Materials and Resources Prerequisite, Storage and Collection of Recyclables, according to the LEED v4 BD+C Reference Guide1. The purpose of this prerequisite is to facilitate the reduction of waste generated by building occupants that is hauled to and disposed of in landfills1. The prerequisite applies to all LEED BD+C projects, but Retail projects have a different approach than other project types because of their unique waste streams and operational characteristics1. Retail projects must conduct a waste stream audit for the duration of the project in an existing location or make projections based on historical data for similar establishments. The audit or projection must identify the top-five recyclable waste streams by weight or volume using consistent metrics throughout1. The waste stream study period must be a minimum of 24 hours1. Retail projects must also provide dedicated areas that serve the entire building and are accessible to waste haulers and building occupants for the collection and storage of materials for recycling for at least four of the top-five recyclable waste streams identified by the audit or projection1.
Question 19 Choose 1
Which is a benefit of earning Regional Priority credits?
Show answerHide answer

Correct answer: A The LEED project can achieve more sustainable outcomes by recognizing the issues that are a priority in the project's location

Explanation

Explanation: A benefit of earning Regional Priority credits is that the LEED project can achieve more sustainable outcomes by recognizing the issues that are a priority in the project’s location. Regional Priority credits are not new LEED credits, but instead are existing credits that USGBC regional councils and chapters have designated as being particularly important for their areas1. The incentive to achieve the credits is in the form of a bonus point. If an RP base credit is earned, then a bonus point is awarded to the project’s total points1. This way, the project can address the geographically specific environmental, social equity and public health priorities of its location2.
Question 20 Choose 1
A project attempting to meet the preferred parking requirements for Location and Transportation Credit, Green Vehicles may provide what incentive to meet the requirements and highlight the project sustainable vehicle strategy?
Show answerHide answer

Correct answer: C A permanent discounted parking rate of at least 20% for all green vehicles

Explanation

Explanation: The Location and Transportation Credit, Green Vehicles aims to reduce transportation-related greenhouse gas emissions by promoting the use of low-emitting, fuel-efficient, and alternative-fuel vehicles1. One of the requirements for this credit is to provide preferred parking for green vehicles for 5% of the total vehicle parking capacity of the project1. Preferred parking is defined as parking that is clearly marked and located in the most convenient spaces available to the driver or nearest to the main entrance of the project2. In addition to providing preferred parking, the project may also offer one or more incentives to encourage the use of green vehicles, such as a discounted parking rate, free parking passes, or rebates for parking fees3. The question asks what incentive may be provided to meet the requirements and highlight the project sustainable vehicle strategy. The correct answer is C. A permanent discounted parking rate of at least 20% for all green vehicles, because this incentive meets the minimum threshold of 20% discount suggested by the LEED Reference Guide for Building Design and Construction3, and it also demonstrates the project’s commitment to supporting green vehicles in the long term. The other options are either not sufficient or not relevant for this credit. Option A. Three years of free parking for green vehicles is not sufficient because it is not permanent and may not be attractive enough for drivers to switch to green vehicles. Option B. Preferred parking decals for 5% of occupants utilizing carpool vehicles is not relevant because it does not address green vehicles, but rather carpool vehicles, which are covered by a different credit (Location and Transportation Credit, Reduced Parking Footprint)4. Option D. An annual maintenance voucher for at least 5% of occupants driving green vehicles is not sufficient because it is not directly related to parking and may not be a significant incentive for drivers.
Full mock exam

Sit the LEED-AP-BD+C exam before exam day

Full-length mocks with the same number of questions and the same time limit as the real LEED-AP-BD+C exam. Every attempt draws a new set of questions from the full bank, so you can keep going until you pass comfortably.

Get full LEED-AP-BD+C mock exam
  • 65questions per mock
  • 105 mintime limit
  • 99questions in the bank
  • Newmock on every attempt