Question 31 Choose 1
In a lean environment, the batch-size decision for planning "A" items would be done by:
Show answerHide answer

Correct answer: C lot-for-lot (L4L).

Explanation

Explanation: In a lean environment, the batch-size decision for planning “A” items would be done by lot-for-lot (L4L). A lean environment is a production system that aims to eliminate waste and maximize value by applying the principles and practices of lean manufacturing1. “A” items are the most important items in an inventory system, based on the Pareto principle or the 80/20 rule, which states that 80%of the effects come from 20% of the causes2. Lot-for-lot (L4L) is an inventory ordering policy that orders exactly the quantity needed to meet the demand for each period3.
The reason why L4L is the preferred batch-size decision for planning “A” items in a lean environment is because it minimizes the inventory holding costs and reduces the risk of obsolescence or deterioration of the items3. L4L also supports the concept of pull production, which is a key element of lean manufacturing. Pull production is a method of controlling the flow of materials and information by producing only what is requested by the downstream customers or processes4. L4L aligns the production and consumption rates of “A” items, which are typically high-demand and high-value items, and avoids overproduction or underproduction. L4L also enables faster feedback and learning, as well as better responsiveness to customer needs and expectations.
The other options are not as suitable for planning “A” items in a lean environment. Least total cost is an inventory ordering policy that orders the quantity that minimizes the sum of ordering costs and holding costs5. However, this policy does not consider the demand variability or customer service level, and may result in large batch sizes that increase inventory levels and waste. Min-max is an inventory ordering policy that orders a fixed quantity whenever the inventory level falls below a minimum level6. However, this policy does not reflect the actual demand or consumption rate, and may result in excess inventory or stockouts. Periodic order quantity is an inventory ordering policy that orders a variable quantity at fixed time intervals. However, this policy does not synchronize the production and consumption rates, and may result in mismatched supply and demand.

References: Lean Manufacturing - Definition & Principles - ASQ; Pareto Principle - Definition & Examples - Investopedia; Lot-for-Lot (L4L) Definition | Operations & Supply Chain Dictionary; Pull Production - Definition & Examples - ASQ; Economic Order Quantity (EOQ) Definition - Investopedia; Min-Max Inventory Management: Definition & Examples - Video & Lesson Transcript | Study.com; [Periodic Order Quantity (POQ) Definition | Operations & Supply Chain Dictionary].
Question 32 Choose 1
Staging in a manual system corresponds to which of the following functions in a computer system?
Show answerHide answer

Correct answer: C Dispatching

Explanation

Explanation: Staging in a manual system corresponds to dispatching in a computer system. Staging is the process of preparing and moving materials or components to the point of use or consumption in a production system1. Staging can be done manually by workers who physically move the items from storage areas to workstations, or automatically by conveyors, robots, or other devices2. Dispatching is the process of authorizing and releasing work orders or tasks to the production system3. Dispatching can be done manually by supervisors who assign work to workers, or automatically by computer systems that use algorithms or rules to prioritize and schedule work4. Both staging and dispatching are functions that facilitate the flow of materials and information in a production system and ensure that the right items are available at the right time and place.

References: CPIM Part 2 Exam Content Manual, Domain 6: Plan, Manage, and Execute Detailed Schedules, Section 6.1: Detailed Scheduling Concepts and Tools, p. 75- 76; Staging (manufacturing) - Wikipedia; Staging - an overview | ScienceDirect Topics; Dispatching - an overview | ScienceDirect Topics; Dispatching: Meaning, Objectives, Importance and Procedure.
Question 33 Choose 1
Operations strategy:
Show answerHide answer

Correct answer: B involves translating market requirements into operations decisions.

Explanation

Explanation: Operations strategy is the process of aligning the operations function with the strategic goals of the organization. It involves translating market requirements into operations decisions that support the competitive priorities of the organization. Operations strategy is not a bottom-up reflection of what the whole group or business wants to do, but rather a top-down alignment of the operations function with the overall business strategy. Operations strategy is not a top-down activity where operations improvements cumulatively build strategy, but rather a deliberate and coherent plan that guides the design and management of the operations system. Operations strategy is not only about exploiting operations capabilities in the global market, but also about developing and sustaining those capabilities in response to the changing market needs.

References := What Is an Operations Strategy? Definition and Benefits, Operations Strategy: Definition And Impact On Projects - monday.com, Operations Strategy: Definition, Example & Strategies In 2022
Question 34 Choose 1
Which of the following inventory management techniques is most responsive to changes in demand levels?
Show answerHide answer

Correct answer: A Two-bin system

Explanation

Explanation: A two-bin system is a type of inventory management technique that uses two containers or bins to store and replenish items. When the first bin is empty, the second bin is used to supply the demand while the first bin is reordered. A two-bin system is most responsive to changes in demand levels because it triggers replenishment orders based on actual consumption rather than fixed time intervals or reorder points. A two-bin system can reduce stockouts, improve service levels, and lower inventory costs.

References: CPIM Exam Content Manual Version 7.0, Domain 5: Plan and Manage Inventory, Section 5.2: Implement Inventory Plans, Subsection 5.2.3: Describe how to implement inventory replenishment techniques (page 46).
Question 35 Choose 1
The major contribution of the production plan is to:
Show answerHide answer

Correct answer: B provide authorization for the master schedule.

Explanation

Explanation: According to the web search results, the production plan is a long-term plan that establishes the quantity and timing of the end products to be produced by the company1. The production plan is based on the forecasted demand, the available capacity, and the company’s strategic objectives2. The production plan is also used to authorize and guide the master schedule, which is a more detailed and short-term plan that specifies the quantity and timing of each end product to be produced in each time period3. The master schedule is derived from the production plan, and it must not exceed the production plan’s limits. Therefore, the major contribution of the production plan is to provide authorization for the master schedule.

The other options are not correct, because they are either irrelevant or inaccurate. The production plan does not establish demand by end item, but rather responds to the forecasted demand by end item. The production plan does not identify key resources to support the master schedule, but rather determines the overall resource requirements to meet the production targets. The production plan does not establish the weekly build schedule, but rather provides the basis for the weekly build schedule, which is a more detailed breakdown of the master schedule that specifies how many units of each end product will be built in each week.

References:
Production Planning - Definition, Objectives, Types, Importance
Production Planning in Manufacturing: Best Practices for Production Plans
Master Production Schedule (MPS) - Definition & Examples | Marketing Tutor
[Master Production Schedule (MPS) - Meaning & Process | Tallyfy]
[Production Planning - an overview | ScienceDirect Topics]
[Production Planning: Definition, Levels, Objectives and Factors]
[What Is a Weekly Build Schedule? | Bizfluent]
Question 36 Choose 1
The most relevant measure of customer service performance is:
Show answerHide answer

Correct answer: A service perceived by the customer against service expected by the customer.

Explanation

Explanation: Customer service performance is the degree to which a product or service meets or exceeds customer expectations. The most relevant measure of customer service performance is how the customer perceives the service compared to what they expected.
This measure reflects the customer’s satisfaction and loyalty, which are key factors for business success. Other measures, such as service promised versus measured, customer complaints, or positive feedback, are more related to the supplier’s perspective and may not capture the customer’s true perception of service quality.

References : CPIM Part 2 Exam Content Manual, Domain 3: Plan and Manage Demand, Section A: Demand Management, Subsection 4: Customer Service Management, Page 11.
Question 37 Choose 1
Risk pooling would work best for items with:
Show answerHide answer

Correct answer: D high demand uncertainty and long lead times.

Explanation

Explanation: Risk pooling is a strategy to reduce the total safety stock by aggregating the inventory of multiple items or locations. Risk pooling works best for items with high demand uncertainty and long lead times, because these items have higher variability and require more safety stock. By pooling the inventory, the variability of the total demand is reduced, and the safety stock can be lowered without increasing the risk of stockouts.

References:
CPIM Part 2 Exam Content Manual, Domain 5: Plan and Manage Inventory, Section 5.3: Inventory Management Policies and Objectives, p. 28.
Question 38 Choose 1
An outlier has been identified in the demand data for an item. The most appropriate next step would be to:
Show answerHide answer

Correct answer: B screen the outlier for manual review.

Explanation

Explanation: An outlier is a data point that falls outside of the expected range of the data, i.e., it is an unusually large or small data point1. Outliers can have a significant adverse impact on the forecasts, as they can skew the data distribution and distort the statistical analysis2. Therefore, it is important to detect and remove outliers from the demand data before generating forecasts.
One of the techniques that can be used to detect outliers is to use the standard deviation of the data, or the equivalent z-score, to determine the outlier limit3. For example, one approach is to set the lower limit to three standard deviations below the mean, and the upper limit to three standard deviations above the mean. Any data point that falls outside this range is detected as an outlier.
However, detecting outliers is not enough. The most appropriate next step would be to screen the outlier for manual review. This means that the detected outlier should be examined by a humanexpert to determine whether it is a true outlier or not, and whether it should be corrected or not4. This is because not all outliers are erroneous or irrelevant. Some outliers may be valid observations that reflect real changes in demand, such as seasonal peaks, promotional effects, or market trends. In such cases, correcting or removing the outliers may lead to inaccurate or biased forecasts.
Therefore, screening the outlier for manual review can help verify the cause and validity of the outlier, and decide on the best course of action. Some of the possible actions are:

Correcting the outlier: replacing the outlier with a more typical value based on historical data or expert judgment. This can smooth out the data and reduce the noise.
Separating the demand streams: splitting the data into two or more series based on different factors that influence demand, such as product type, customer segment, or distribution channel. This can isolate the outliers and allow different forecasting methods to be applied to each series.
Adjusting the forecasting model: modifying the parameters or assumptions of the forecasting model to account for the outliers, such as using a different smoothing factor, trend component, or error term. This can improve the fit and accuracy of the model.

References: 1: Outlier Definition 1 2: How to Forecast Data Containing Outliers 2 3: How to Detect Outliers in Machine Learning – 4 Methods for Outlier Detection 1 4: How Outlier Detection and Correction Works 4 : How to Understand What is an Outlier in Forecasting 3
Question 39 Choose 1
What is a result of effective production activity control (PAC)?
Show answerHide answer

Correct answer: A Actual input/output matches planned input/output

Explanation

Explanation: Production activity control (PAC) is the function of managing the flow of materials and work-in-progress in a manufacturing system. PAC is responsible for executing the master production schedule and the material requirements plan, as well as for planning, implementing, and monitoring the production activities. PAC aims to ensure that the required resources are available, that the production orders are released and completed on time, and that the quality and quantity standards are met. A result of effective PAC is that the actual input/output matches the planned input/output. This means that the actual amount and timing of materials, labor, and machines used for production are consistent with the planned amount and timing. This indicates that the production process is efficient, reliable, and synchronized with the demand. This also helps to reduce inventory, lead time, and waste.
The other options are not necessarily results of effective PAC. Less scrap and rework on the shop floor may be a result of effective quality control, which is a separate function from PAC. Quality control is concerned with inspecting and testing the products or services to ensure that they meet the specifications and standards. Fewer machine hours are required for production may be a result of effective process improvement, which is a separate function from PAC. Process improvement is concerned with analyzing and enhancing the production methods and techniques to increase productivity and performance. Available capacity is increased may be a result of effective capacity planning, which is a separate function from PAC. Capacity planning is concerned with determining and adjusting the optimal level of resources needed to meet the demand.

References: Production Activity
Control - Tutorial; Production Control: Process, Types and Best Practices - ProjectManager; Production control - Wikipedia.
Question 40 Choose 1
The results from responding to uncertainty in the supply chain by exaggerating lead times and increasing lot sizes is called:
Show answerHide answer

Correct answer: A bullwhip effect.

Explanation

Explanation: The results from responding to uncertainty in the supply chain by exaggerating lead times and increasing lot sizes is called the bullwhip effect. The bullwhip effect is a phenomenon that occurs when small changes in demand at the downstream end of the supply chain (such as retailers or customers) cause larger and larger fluctuations in demand at the upstream end of the supply chain (such as wholesalers, distributors, or manufacturers). The bullwhip effect can create inefficiencies, waste, and costs in the supply chain, as well as reduce customer satisfaction and profitability.
One of the causes of the bullwhip effect is the response to uncertainty in the supply chain by exaggerating lead times and increasing lot sizes. Lead time is the time between placing an order and receiving it from a supplier. Lot size is the quantity of units ordered or produced at a time. When there is uncertainty or variability in demand or supply, such as due to seasonality, promotions, disruptions, or forecasting errors, some supply chain members may try to cope by exaggerating lead times and increasing lot sizes. For example, a retailer may increase its safety stock or reorder point to avoid stockouts or delays, or a manufacturer may produce more than needed to take advantage of economies of scale or discounts. However, these actions can have unintended consequences, as they can distort the demand information and amplify the demand variability along the supply chain. This can result in excess inventory, low inventory turnover, high holding costs, poor service levels, lost sales, obsolete products, or capacity issues.
To prevent or reduce the bullwhip effect caused by responding to uncertainty in the supply chain by exaggerating lead times and increasing lot sizes, some possible solutions are:

Improving communication and collaboration among supply chain members to share accurate and timely demand information and forecasts.
Reducing lead times and lot sizes by using lean production techniques, just-in-time inventory systems, or quick response methods.
Implementing vendor-managed inventory (VMI) systems, where suppliers are responsible for managing and replenishing the inventory of their customers based on their actual consumption data.
Adopting advanced technologies, such as radio-frequency identification (RFID), artificial intelligence (AI), or blockchain, to enhance visibility, traceability, and coordination in the supply chain.

References := Bullwhip Effect: Meaning, Example, Impact - Investopedia, Bullwhip Effect - What Is It, Causes, Supply Chain, Examples, Bullwhip Effect: Example, Causes, and Impact on Supply Chain
Full mock exam

Sit the CPIM-Part-2 exam before exam day

Full-length mocks with the same number of questions and the same time limit as the real CPIM-Part-2 exam. Every attempt draws a new set of questions from the full bank, so you can keep going until you pass comfortably.

Get full CPIM-Part-2 mock exam
  • 65questions per mock
  • 105 mintime limit
  • 151questions in the bank
  • Newmock on every attempt