Show answerHide answer
Correct answer: B Documents must be policy, process, and procedure documents
Explanation
Explanation:When a Certified CMMC Assessor (CCA) uses the Examine method, they review objective evidence (e.g., policies, processes, procedures) to determine if a practice is implemented. The evidence must be finalized and verifiable. Only documented policies, processes, and procedures constitute acceptable Examine artifacts—not drafts, in-process materials, or unspecified formats.
Correct Option:
B — Documents must be policy, process, and procedure documents.
Examine requires documented, finalized evidence demonstrating how the OSC implements a practice. Policies (what), processes (how organized), and procedures (step-by-step) form the core of evidence. Drafts or informal notes are not acceptable for Examine.
Incorrect Options:
A — Documents utilized for review must be in their mailed form.
Incorrect. "Mailed form" is not a CMMC assessment term. Evidence can be electronic, shared via secure portals, or printed—there is no requirement for physical mail. This distracts from the actual requirement of finalized documentation.
C — Training materials reviewed can be in-process as they are for educational purposes.
Incorrect. Examine requires final, approved evidence. In-process or draft training materials are not verifiable and do not prove implementation. Training evidence must be completed records (e.g., attendance logs, completed exams) to be valid.
D — System-level, network, and data flow diagrams must be completed in draft format.
Incorrect. Diagrams used for Examine must be finalized, accurate, and approved. Draft diagrams indicate incomplete analysis and cannot serve as reliable evidence. CMMC requires current, validated diagrams for scoping and practice assessment.
Reference:
CMMC Assessment Guide (CAG), Level 2, Section on Assessment Methods — Examine. See also CMMC CCA Handbook, Evidence Requirements for Examine Method.