Question 1 Choose 1
An energy-saving project costs $540,000. The project will have maintenance costs of $25,000 per year. The energy savings from the project are $160,000 per year. What is the simple payback of the project?
Show answerHide answer

Correct answer: C 4.0 years

Question 2 Choose 1
If the initial design process includes group relamping, how can this reduce the number of lamps required to illuminate a space?
Show answerHide answer

Correct answer: A Group relamping reduces factors that contribute to light loss, which means fewer lamps are required to illuminate a space

Question 3 Choose 1
A 3 MW rated wind-powered turbine has a rotor diameter of 113 meters. What is the efficiency of the wind turbine at rated power if it is operating in wind power calculated at 8.6 MW? Assume an air density of 1.225 kg/m³.
Show answerHide answer

Correct answer: B 34.9%

Question 4 Choose 1
How much fuel is required to heat 50 kg water from 20°C water to 200°C saturated steam? Assume the boiler is 80% efficient (based on the higher-heating value of the fuel).
Show answerHide answer

Correct answer: B 169.3 MJ

Question 5 Choose 1
Which pump system listed below is most likely the best application for converting to variable-speed drive?
Show answerHide answer

Correct answer: D Pump system with throttle fully open circulating liquid in a closed loop cooling system

Question 6 Choose 1
Which of the following steam turbines will likely not provide steam output at a useable temperature for industrial processes?
Show answerHide answer

Correct answer: C Condensing turbine

Question 7 Choose 1
A facility has a monthly peak power demand of 1,000 kW and an average power factor of 80%. The facility pays a demand charge of $7.50/kVA-month. What is the additional cost per month because the power factor is less than 100%?
Show answerHide answer

Correct answer: C $1,875/month

Question 8 Choose 1
You are using a performance contract to finance the added cost of using more-efficient equipment in the construction of a new building. Which of the following International Performance Measurement and Verification Protocol (IPMVP) options would you use to verify annual energy savings?
Show answerHide answer

Correct answer: C Option C - Whole facility measurement

Question 9 Choose 1
A building is conditioned by an air-conditioning and heating system. What technology can directly prevent simultaneous heating and cooling of the space?
Show answerHide answer

Correct answer: C Variable air volume control

Question 10 Choose 1
Thermal scans of electrical equipment are useful for:
Show answerHide answer

Correct answer: C Locating a loose electrical connection

Full mock exam

Sit the CEM exam before exam day

Full-length mocks with the same number of questions and the same time limit as the real CEM exam. Every attempt draws a new set of questions from the full bank, so you can keep going until you pass comfortably.

Get full CEM mock exam
  • —questions per mock
  • —time limit
  • 130questions in the bank
  • Newmock on every attempt