Find out if you're ready for CCP. Take the free timed mock exam and get your score in minutes, or study the free CCP questions below with answers and explanations.
Listening to what is being said by all members of a group or audience and then summarizing or interpreting is called______________.
Show answerHide answer
Correct answer: DFacilitative listening
Question 2Choose 1
What relationship more accurately defines a situation model of parallel activities that require a partial start of one activity?
Show answerHide answer
Correct answer: AStart to start
Question 3Choose 1
A major theme park is expanding the existing facility over a five-year period. The design phase will be completed one year after the contract is awarded. Major engineering drawings will be finalized two years after the design contract is awarded and construction will begin three years after the award of the design contract. New, unique ride technology will be used and an estimate will need to be developed to identify these costs that have no historical data.
The following is NOT an advantage of the critical path method:
Show answerHide answer
Correct answer: AThe ability to determine cost overruns of critical path activities
Question 4Choose 1
The process of stating goals and determining the most effective way of reaching them is the definition for:
Show answerHide answer
Correct answer: DPlanning
Question 5Choose 1
A task has an early start of day 4. late start of day 14. early finish of day 10. and a late finish of day 20. What is the task's float?
Show answerHide answer
Correct answer: B10
Question 6Choose 1
You have recently been appointed as the Cost Engineer to oversee process improvement projects for a Discrete Part Manufacturer. You have been asked to calculate the CPI on a project initiated to implement a Value Stream Mapping Initiative. The accountant is only able to provide you with BAC and EAC figures of $ 5000 and 57500 respectively. The CPI is:
unable to be calculated from the information given
Show answerHide answer
Correct answer: A
Question 7Choose 1
Deliberate low bidding is often referred to as buying the job. Which of the following would not be a reason for low bidding?
Show answerHide answer
Correct answer: BBacking out of the bid competition
Question 8Choose 1
Which of the following is a common technique to approximate the standard deviation?
Show answerHide answer
Correct answer: ARange/4
Question 9Choose 1
An agricultural corporation that paid 53% in income tax wanted to build a grain elevator designed to last twenty-five (25) years at a cost of $80,000 with no salvage value. Annual income generated would be $22,500 and annual expenditures were to be $12,000.
Answer the question using a straight line depreciation and a 10% interest rate.
Which of the following should be included in the life-cycle cost analysis of a power plant?
An agricultural corporation that paid 53% in income tax wanted to build a grain elevator designed to last twenty-five (25) years at a cost of $80,000 with no salvage value. Annual income generated would be $22,500 and annual expenditures were to be $12,000.
Answer the question using a straight line depreciation and a 10% interest rate.
How much money should be set aside today to have $20,000 available eight (8) years from now if the interest rate is 6% compounded annually?
Show answerHide answer
Correct answer: D$13,515