Microsoft certification · Exam MO-201

MO-201 Mock Exam Page 2

Microsoft Excel Expert (Excel and Excel 2019)

Free MO-201 mock exam questions 11–12, each with the answer and an explanation.

12 questions · 20 minutes · free, no sign-up

Free MO-201 questions

11–12 of 12 free
Question 11
Instructions
Exam Environment
Exam Interface and Controls
The exam panel provides access to the project task(s). Each project has an associated file in which you will perform the project tasks.

1. Project file
2. Split bar
3. Exam panelYou can modify the exam interface to fit your needs in the following ways:
To increase or decrease the exam panel font size, press Ctrl+Plus or Ctrl+Minus.
To change the height of the exam panel, drag the split bar between the project file and the exam panel.
To minimize the exam panel, click the Collapse Panel arrow in the upper-left corner of the exam panel. The minimized exam panel displays the Expand Panel button, the project number and name, the remaining time, and the Restart Project and Submit Project buttons. To move between tasks, you must expand the exam panel.
To restore the interface to the default appearance, click the Restore button near the upper-right corner of the exam panel.

4. The Information bar at the top of the exam panel displays the current project and total number of projects, the remaining exam time, and the following commands:
Collapse Panel. Minimizes the exam panel to provide more space for the project file.
Restart Project. Closes and reopens the current project file without saving your changes.
Submit Project. Saves your changes, submits the project file, and moves to the next project.
Calculator. A calculator is available in some exams. You are not required to use the calculator.
Restore. Restores the size and position of the project file and exam panel to the defaults.
Help. Displays information about the exam interface.
5. The Content area displays the task tabs and the current task description.
6. The Navigation area at the bottom of the exam panel contains the following commands.
Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.
Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.
Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.
Mark as complete. Flags the task to indicate that you feel you have completed the task.In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.
End of the instructions.
On the “Regional Sales” worksheet, modify the PivotTable to display the “Territory” rows within each region.
Show answerHide answer

Explanation

Explanation:

Hierarchical Layout: In PivotTables, the order of fields in the Rows area determines the nesting levels. By placing "Territory" under "Region," you create a parent-child relationship that organizes data exactly as the prompt requires.

Why dragging to "Columns" is incorrect:
Moving "Territory" to the Columns area would create a cross-tabulation (matrix) view rather than displaying rows within regions, making the data harder to compare vertically.

Why "Grouping" is incorrect:
Manual grouping is used for dates or numbers (as seen in previous tasks). For categorical data like "Territory," simply moving the field into the Row hierarchy is the standard and most efficient method.

References
Exam Objective 4.1: Create and Modify PivotTables (Modify field selections and options). Ribbon Context: PivotTable Analyze Tab > Show Group > Field List. Interface Logic: Field arrangement in the Rows section of the Task Pane.
Question 12
Instructions
Exam Environment
Exam Interface and Controls
The exam panel provides access to the project task(s). Each project has an associated file in which you will perform the project tasks.

1. Project file
2. Split bar
3. Exam panel
You can modify the exam interface to fit your needs in the following ways:
To increase or decrease the exam panel font size, press Ctrl+Plus or Ctrl+Minus.
To change the height of the exam panel, drag the split bar between the project file and the exam panel.
To minimize the exam panel, click the Collapse Panel arrow in the upper-left corner of the exam panel. The minimized exam panel displays the Expand Panel button, the project number and name, the remaining time, and the Restart Project and Submit Project buttons. To move between tasks, you must expand the exam panel.

4. The Information bar at the top of the exam panel displays the current project and total number of projects, the remaining exam time, and the following commands:
Collapse Panel. Minimizes the exam panel to provide more space for the project file.
Restart Project. Closes and reopens the current project file without saving your changes.
Submit Project. Saves your changes, submits the project file, and moves to the next project.
Calculator. A calculator is available in some exams. You are not required to use the calculator.
Restore. Restores the size and position of the project file and exam panel to the defaults.
Help. Displays information about the exam interface.
5. The Content area displays the task tabs and the current task description.
6. The Navigation area at the bottom of the exam panel contains the following commands.
Previous Task/Next Task. Saves your response and moves to the previous or next task in the current project.
Leave feedback after exam. Flags the task to indicate that you want to leave feedback about it after the exam.
Mark for review. Flags the task to indicate that you want to return to it before you finish the exam.
Mark as complete. Flags the task to indicate that you feel you have completed the task.
In projects that contain multiple tasks, you can switch between tasks by clicking the task tab, Next Task button, or Previous Task button.
End of the instructions.
On the “New Products” worksheet, create a Histogram chart that shows the “Retail Price” of the products in bins with widths of $10.
The chart size and position do not matter.
Show answerHide answer

Explanation

Explanation:

Why Histogram is correct: A Histogram is specifically designed to show frequency distribution. Unlike a Column chart, which treats every price as a unique category, a Histogram groups data into "bins" to show density.

Why Bin Width modification is required:
By default, Excel uses "Automatic" binning (Rice's Rule). The prompt specifically requires widths of $10, which forces the chart to group prices in increments like $0-$10, $10-$20, etc.

Why "Number of Bins" is incorrect:
If you choose "Number of bins" instead of "Bin width," you are telling Excel how many columns to show, but the width of those columns would fluctuate based on the data range. The task specifically asks for the width to be set.

Ignore Placement:
As noted in the instructions, do not waste time moving or resizing the chart; the grading software checks the chart type and the axis properties, not its coordinates.

References:
Exam Objective 4.2: Create and modify advanced charts (Create and modify Histograms). Ribbon Path: Insert Tab > Charts Group > Statistical Chart > Histogram. Formatting Path: Right-click Horizontal Axis > Format Axis > Axis Options > Bin Width.

That's the last free question

You've seen the free 30% (12 of 41 questions). Full access unlocks every question and full-length MO-201 mock exams (65 questions, 105 minutes), a different mock on every attempt.

Unlock full mock exam
Full mock exam

Sit the MO-201 exam before exam day

Full-length mocks with the same number of questions and the same time limit as the real MO-201 exam. Every attempt draws a new set of questions from the full bank, so you can keep going until you pass comfortably.

Get full MO-201 mock exam
  • 65questions per mock
  • 105 mintime limit
  • 41questions in the bank
  • Newmock on every attempt