Using this data calculate the percentage of DPU.
Show answerHide answer
Correct answer: B
B. 3.23
IASSC Lean Six Sigma - Black Belt
Find out if you're ready for ICBB. Take the free timed mock exam and get your score in minutes, or study the free ICBB questions below with answers and explanations.
20 questions · 33 minutes · free, no sign-up
Using this data calculate the percentage of DPU.
Correct answer: B
B. 3.23
SPC Charts are used extensively in different business and decision-making environments.
In this example a vendor is being selected based on speed of delivery. Which of the
conclusions would help you pick a vendor for your needs regarding lead-time of delivery
from your vendors?(Note:There are 4 correct answers).

Correct answer: B, C, D, E
Vendor B as it has a better consistency (lower variance) on lead time Vendor B as Vendor A shows a situation out of control as shown in red Vendor B as the Control Limits are much narrower than Vendor A Vendor B with higher lead time, but a process with much narrower Control Limits
Six Sigma is a business improvement discipline whose fundamental view is based on a
_________ oriented approach of the business.
Correct answer: B
Performance
Control Charts were developed by Dr. Shewhart to track data over time. To detect Special
Cause variation the Control Charts use which of these?
Correct answer: C
Center Line and Control Limits
A Non-parametric Test should be used if just one distribution is not Normal out of the two or
more gathered.
Correct answer: D
We reject the Null Hypothesis
Which statements are correct about the advanced Capability Analysis shown here?
(Note:There are 3 correct answers).
Correct answer: B, C, E
B. The average DPU with 95% confidence is between 0.024 and 0.0295. C. The DPU does not seem to vary depending on sample size. The maximum DPU in one observation was nearly 0.0753
A Lean Six Sigma project is attempting to reduce inventory days. The Process Capability
will be monitored as part of the Control Phase to track the sustainability of the
improvement. 
Which distribution type is best used for performing the Capability Analysis?
Correct answer: A
Weibull Distribution
Following process modifications, the Null Hypothesis states that no improvement to the
process has occurred. If we discover the Null Hypothesis Test was rejected when it was
false that would be a(n) ________________________.
Correct answer: C
Type II Error
The _______ is the most frequently occurring value in a distribution of data.
Correct answer: C
Mode
For the data shown here which statement(s) are true?(Note:There are 2 correct
Correct answer: B, D
With greater than 95% confidence, we conclude the samples are from Non-normal If we wanted to compare the Central Tendencies of these three samples we could use