Question 1 Choose 1

Using this data calculate the percentage of DPU.

Show answerHide answer

Correct answer: B

B. 3.23

Question 2 Choose 4

SPC Charts are used extensively in different business and decision-making environments.
In this example a vendor is being selected based on speed of delivery. Which of the
conclusions would help you pick a vendor for your needs regarding lead-time of delivery
from your vendors?(Note:There are 4 correct answers).

Show answerHide answer

Correct answer: B, C, D, E

Vendor B as it has a better consistency (lower variance) on lead time

Vendor B as Vendor A shows a situation out of control as shown in red

Vendor B as the Control Limits are much narrower than Vendor A

Vendor B with higher lead time, but a process with much narrower Control Limits

Question 3 Choose 1

Six Sigma is a business improvement discipline whose fundamental view is based on a
_________ oriented approach of the business.

Show answerHide answer

Correct answer: B

Performance

Question 4 Choose 1

Control Charts were developed by Dr. Shewhart to track data over time. To detect Special
Cause variation the Control Charts use which of these?

Show answerHide answer

Correct answer: C

Center Line and Control Limits

Question 5 Choose 1

A Non-parametric Test should be used if just one distribution is not Normal out of the two or
more gathered.

Show answerHide answer

Correct answer: D

We reject the Null Hypothesis

Question 6 Choose 3

Which statements are correct about the advanced Capability Analysis shown here?

(Note:There are 3 correct answers).

Show answerHide answer

Correct answer: B, C, E

B. The average DPU with 95% confidence is between 0.024 and 0.0295.

C. The DPU does not seem to vary depending on sample size.

The maximum DPU in one observation was nearly 0.0753

Question 7 Choose 1

A Lean Six Sigma project is attempting to reduce inventory days. The Process Capability
will be monitored as part of the Control Phase to track the sustainability of the
improvement. 
Which distribution type is best used for performing the Capability Analysis?

Show answerHide answer

Correct answer: A

Weibull Distribution

Question 8 Choose 1

Following process modifications, the Null Hypothesis states that no improvement to the
process has occurred. If we discover the Null Hypothesis Test was rejected when it was
false that would be a(n) ________________________.

Show answerHide answer

Correct answer: C

Type II Error

Question 9 Choose 1

The _______ is the most frequently occurring value in a distribution of data.

Show answerHide answer

Correct answer: C

Mode

Question 10 Choose 2

For the data shown here which statement(s) are true?(Note:There are 2 correct


Show answerHide answer

Correct answer: B, D

With greater than 95% confidence, we conclude the samples are from Non-normal
Distributions

If we wanted to compare the Central Tendencies of these three samples we could use
Mood’s Median test

Full mock exam

Sit the ICBB exam before exam day

Full-length mocks with the same number of questions and the same time limit as the real ICBB exam. Every attempt draws a new set of questions from the full bank, so you can keep going until you pass comfortably.

Get full ICBB mock exam
  • 65questions per mock
  • 105 mintime limit
  • 241questions in the bank
  • Newmock on every attempt