SAP certification · Exam E_S4HCON2023

E_S4HCON2023 Mock Exam

SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade

Find out if you're ready for E_S4HCON2023. Take the free timed mock exam and get your score in minutes, or study the free E_S4HCON2023 questions below with answers and explanations.

20 questions · 45 minutes · free, no sign-up

Free E_S4HCON2023 questions

1–10 of 23 free
Question 1 Choose 1
You are executing a standard SUM procedure to update an SAP system using main configuration mode "Standard". When will the shadow system be stopped for the last time?

Please choose the correct answer.
Show answerHide answer

Correct answer: A Before the downtime starts

Explanation

Explanation:

In the Standard mode of SUM, the process is explicitly designed to separate work into downtime-minimized (PREPARE) and downtime (EXECUTE) phases. The shadow system is a technical clone used exclusively during the PREPARE phase to perform repository conversion tasks while the productive system remains operational.

The shadow system is stopped immediately after completing the PREPARE phase and before the productive system shutdown begins. This is a defined transition point: once the shadow system's work is validated, it is decommissioned, and only then does the actual business downtime start with the production system stop.

Why other options are incorrect:

B. At the end of the downtime:
Incorrect because the shadow system is dismantled before downtime begins and plays no role during EXECUTE phase activities.

C. As part of the cleanup process:
Incorrect because cleanup occurs post-update, after successful restart. The shadow system's resources are released much earlier.

D. Early in the downtime:
Incorrect because downtime is defined as starting when the productive system stops. The shadow system must already be stopped before this occurs; they do not coexist during downtime.

Reference:
This follows SAP's standard SUM procedure as documented in SAP Help Portal: "Phases of the SUM Procedure" and SAP Note 2133366 - "SUM guide for SAP S/4HANA." The architecture ensures the shadow system executes all possible tasks during uptime, and its termination triggers the controlled handover to the downtime phase, minimizing business disruption.
Question 2 Choose 1
You are performing an upgrade of an SAP ECC development system with SUM. What is the earliest point when the upgrade is considered complete and you can allow all dialog users to log on to the system?

Please choose the correct answer.
Show answerHide answer

Correct answer: D After the SUM roadmap step "Postprocessing" and post procedure steps are finished

Explanation

Explanation:

The SUM (Software Update Manager) upgrade process follows a strict roadmap. The Postprocessing phase includes critical finalization tasks that must be completed before the system is considered fully stable for all production-like activities, including general dialog user access.

Only after Postprocessing is entirely finished — including essential steps like running SAPup or post-upgrade jobs, finalizing customizing, and verifying system consistency — is the system declared ready for unrestricted use. Allowing users on earlier risks exposing them to an incomplete or unstable system state.

Why other options are incorrect:

A. After "Execution" and before "Postprocessing":
Incorrect because the Execution phase ends with a technical restart, but crucial post-upgrade activities (SPDD/SPAU adjustments, upgrade-specific jobs) are still pending. The system is not functionally complete.

B. During "Postprocessing", after post procedure steps are complete:
This is semantically the same as option D, but the wording of D is more precise and complete in referring to both the roadmap step and its procedural tasks. The standard SUM documentation defines completion at the end of this phase.

C. During "Postprocessing", in parallel with post procedure steps:
Incorrect and unsafe. Postprocessing steps often require system resources and exclusive access; allowing users during this can cause conflicts, errors, or inconsistent data.

Reference:
SAP Help Portal: "Software Update Manager - Procedure" and SAP Note 2133366 (SUM Guide) state that system handover to productive use occurs after successful completion of the Postprocessing phase. This is when the upgrade checklist is fully executed, and the system is in a consistent, supported state for all users.
Question 3 Choose 2
The SUM procedure stops with an error during uptime. How can you identify the current phase, the one in which SUM encountered an error?

There are 2 correct answers to this question.
Show answerHide answer

Correct answer: C, D Check the messages shown by the SUM UICheck the most recent entries in SAPup.log

Explanation

Explanation:

When SUM stops with an error, the primary diagnostic sources are its own logs and interface, which are specifically designed to track its phase-specific progress and failures.

C. SUM UI:
The SUM graphical interface (or console) displays the current roadmap phase and step at the top of its screen. When an error occurs, it also shows a detailed error message, often with a direct link to the relevant log file and the phase/action ID where the failure happened. This is the most immediate way to identify the phase.

D. SAPup.log:
This is the master log file for the entire SUM procedure. It chronologically records every action, including phase transitions (e.g., "START PHASE PREPARE_COMMON_START"). The most recent entries at the bottom of this log will clearly show the last successfully completed step and the phase in which the error occurred. It is the authoritative technical record.

Why the other options are incorrect:

A. File sapevt.trc:
This trace file logs scheduler events (like job starts/stops) but is not the primary source for SUM's procedural phase information. It lacks the detailed roadmap context needed to pinpoint the specific SUM phase.

B. Transaction SM21 (System Log):
The SAP system log records events from the kernel and application server, such as process starts, shutdowns, and internal system errors. It is useful for diagnosing infrastructure issues (e.g., enqueue server crashes) but does not track SUM's roadmap phases or procedural steps. An error causing SUM to stop may appear here, but the log won't tell you if it happened during the "PREPARE_ABAP_DOWN" or "EXECUTE_IN_PLACE_UPG" phase.

Reference:
SAP Help Portal documentation for SUM (Software Update Manager) and SAP Note 2133366 (SUM Guide) direct administrators to use SUM's own logs for troubleshooting. Specifically, the SAPup.log in the SUM work directory (/usr/sap/SUM/abap/log/) is the central log, and the UI provides a structured, phase-oriented view of the procedure's status.
Question 4 Choose 2
You are preparing for a standard SAP S/4HANA conversion from SAP ECC on Windows with SAP MaxDB to SAP S/4HAN. You are performing the corresponding maintenance transaction with the Maintenance Planner. Which kernels do you need to select for the SAP S/4HANA conversion?

There are 2 correct answers to this question.
Show answerHide answer

Correct answer: A, C Kernel for target release, Windows, SAP MaxDBKernel for target release, Windows, SAP HANA

Explanation

Explanation:

During preparation in Maintenance Planner for a standard S/4HANA conversion using SUM/DMO (Database Migration Option), you must select kernels for the target release that correspond to the two distinct database stages of the process:

A. Kernel for target release, Windows, SAP MaxDB:
This kernel is required for the initial phase of the conversion. The system starts on the existing OS (Windows) and the existing database (MaxDB) but is already running the new target S/4HANA release's kernel. SUM uses this kernel to perform the initial upgrade steps on the source database platform.

C. Kernel for target release, Windows, SAP HANA:
This kernel is required for the database migration phase. The OS remains Windows, but the database changes to SAP HANA. SUM switches to this HANA-compatible kernel to perform the actual database migration and subsequent steps on the new HANA database.

The dual selection is necessary because SUM/DMO performs a combined upgrade and database migration in a single procedure, requiring kernels for both the source and target database technologies, but always for the target SAP release.

Why the other options are incorrect:

B. Kernel for target release, Linux, SAP HANA:
Incorrect. The OS is not changing from Windows to Linux in this scenario. The kernel must match the actual OS platform (Windows) throughout the entire process.

D. Kernel for source release, Windows, SAP MaxDB:
Incorrect. For an S/4HANA conversion, you are upgrading the SAP kernel to the target S/4HANA release. The source release kernel is not used by SUM for the conversion procedure itself.

Reference:
SAP Help Portal: "Maintenance Planner for SAP S/4HANA Conversion" and SAP Note 2239665 (DMO of SUM: Frequently Asked Questions). The process documentation specifies that for a DMO-based conversion, you must select the target release kernels for both the source and target database in the Maintenance Planner stack file. The OS selection remains consistent if no OS change is planned.
Question 5 Choose 2
You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA. What do you need to consider? Note: there are 2 correct answers to this question.
Show answerHide answer

Correct answer: B, D The target database size increases temporarily because of the Shadow Repository.Network capacity between exporting and importing R3load processes must be.

Explanation

Explanation:

B. Correct. In DMO (Database Migration Option), a Shadow Repository is created in the target HANA database during the PREPARE phase. This temporarily increases the storage requirement on the HANA system, as it holds a copy of the repository objects while the source system remains active. Sufficient temporary space must be planned for.

D. Correct. DMO uses parallel R3load processes for data export (from source DB) and import (into HANA). These processes communicate via TCP/IP sockets. The network throughput and latency between these processes (even if they run on the same host) are critical performance factors and must be considered during planning. A bottleneck here significantly impacts migration duration.

Why the other options are incorrect:

A. Incorrect. DMO does not support migration from a non-Unicode source system to SAP HANA. A separate, prior Unicode conversion (SUM with UCC) is mandatory. Also, HANA scale-out is supported by DMO and is not a restriction.

C. Incorrect. This describes an old constraint for SAP HANA Landscape Transformation (HLT), which is a different tool. DMO itself does not require manual file editing for reorganization tasks; it manages the migration internally.

E. Incorrect and outdated. DMO always includes Unicode conversion (if needed) as an integrated step for the application layer, regardless of the target ABAP version. The prerequisite is that the database must already be Unicode-compliant (which MaxDB, Oracle, etc., are). The statement refers to obsolete limitations of very early DMO versions.

Reference:
SAP Help Portal: "Database Migration Option (DMO) of SUM" and SAP Note 2239665 (DMO of SUM: Frequently Asked Questions) confirm the temporary space requirement for the shadow repository and the network dependency of R3load processes.

SAP Note 1793345 (DMO: Restrictions) explicitly states that a non-Unicode source system requires a separate Unicode conversion before DMO.
Question 6 Choose 1
SUM was registered at the SAP Host Agent. Based on which information does the SAP Host Agent determine the path to the SUM directory.
Show answerHide answer

Correct answer: D The path was stored in file sumabap conf during registration

Explanation

Explanation:

When SUM registers itself with the SAP Host Agent, it creates a configuration file called sumabap.conf in the SAP Host Agent's profile directory (typically /usr/sap/hostctrl/work/). This file contains the absolute path to the SUM work directory.

The SAP Host Agent reads this configuration file to locate the SUM instance and establish communication for tasks like starting/stopping the SAP system, checking processes, and managing log files during the upgrade or conversion procedure.

Why the other options are incorrect:

A. host_profile:
The host_profile is a generic host agent profile file, but it is not used to store the SUM-specific path. Registration does not modify this base profile.

B. Environment of user adm:
The environment variables of the SAP system administrator user are not modified globally. SUM uses its own runtime environment and communicates its location explicitly via the configuration file.

C. URL entered in the browser:
The browser URL is irrelevant for the SAP Host Agent. The Host Agent runs as an operating system service and does not interact with the browser or web-based interfaces; it uses configuration files for its data.

Reference:
SAP Help Portal documentation for SUM and SAP Host Agent, specifically sections on registration and configuration. The file sumabap.conf is a standard artifact created during the SUM registration process (step "Register SUM in SAP Host Agent") and is documented as the means by which the Host Agent identifies the location of the running SUM instance.
Question 7 Choose 2
Which additional configuration options are offered by SUM when selecting "Switch expert mode on" in main configuration option "Standard"?

There are 2 correct answers to this question.
Show answerHide answer

Correct answer: C, D Reuse a profile for the shadow instance from a previous run.Choose the instance number of the shadow instance.

Explanation

Explanation:

In the Standard mode, enabling "Switch expert mode on" reveals advanced settings primarily related to the shadow instance management, which is a core component of the downtime-minimized approach.

C. Correct. Expert mode allows you to specify a previously created shadow instance profile (default.pfl) from an earlier SUM run. This can save time if a prior run was aborted, as it reuses the already-configured shadow system settings.

D. Correct. By default, SUM automatically assigns an instance number for the shadow instance. Expert mode allows the administrator to manually select and control the instance number (within the valid range, typically 90-99), which can be important for environment-specific port planning or conflict avoidance.

Why the other options are incorrect:

A. Keep archiving on during the whole procedure:
This is not an expert mode setting. Archiving control (switch on/off) is part of the standard main configuration options presented to all users in the downtime configuration phase.

B. Use the Near Zero Downtime Maintenance Technology (NZDM):
This is incorrect. NZDM is a separate main configuration mode (an alternative to "Standard" mode), not an expert setting within the Standard mode. You select NZDM at the beginning of the configuration, not by enabling expert mode.

Reference:
SAP Help Portal: "Software Update Manager - Expert Settings" and the SUM configuration guide (SAP Note 2133366) specify that expert mode in Standard configuration primarily offers control over shadow instance parameters, including profile reuse and instance number assignment.
Question 8 Choose 1
In ICNV. How database operations synchronized between the source and the target table?
Show answerHide answer

Correct answer: A Deletes are directly executed in the target table by delete trigger.

Explanation

Explanation:

During the ICNV process, the system creates a target table with the new structure. To maintain consistency while users are still modifying data in the source table, the database utilizes Database Triggers.

When a user performs a DELETE operation on the source table, the database trigger is immediately activated. This trigger replicates the action by deleting the corresponding record in the target table. This ensures that records intended for removal do not persist in the new table structure after the conversion is finalized.

Why Other Options are Incorrect

Updates as Inserts:
A common distractor suggests that updates are only stored in a log table. In ICNV, while some data is moved via background processes (like the REPLI phase), real-time synchronization of deletions must happen via triggers to prevent data corruption.

Manual Synchronization:
The process is not manual. If the synchronization relied on periodic background jobs instead of triggers for deletes, the target table would contain "stale" or "ghost" data that no longer exists in the source.

Log Table Dependency:
While technologies like SLT or SUM's nZDM use logging tables (e.g., IUUC_ or change logs), standard ICNV is characterized by the direct execution of triggers on the target table to mirror the source's state.

References
SAP Training Material ADM328: (SAP S/4HANA Conversion and SAP System Upgrade) – Section on "Incremental Conversion" and "Database Triggers."
Question 9 Choose 1
What is the main purpose of performing benchmark runs for an SAP S/4HANA conversion?
Show answerHide answer

Correct answer: C To optimize the conversion

Explanation

Explanation:

The primary purpose of a benchmark run is to optimize the conversion duration by identifying the most efficient distribution of resources. During a benchmark run, the SUM tool executes specific phases (typically data migration and conversion phases) with different parallel process settings.

The results allow the administrator to determine the "sweet spot" for parallelization—balancing the number of processes against the hardware's CPU and memory limits. By finding the optimal number of R3load or parallel processes, you can significantly reduce the technical downtime of the actual production cutover.

Why Other Options are Incorrect

A & D. To optimize migration / main import:
While migration (moving data to HANA) and the Main Import (importing new software levels) are parts of the process, "Conversion" is the broader, more accurate term used in the E_S4HCON2023 curriculum to describe the holistic transformation of data structures (e.g., from Finance to Universal Journal).

B. To optimize activation:
Activation usually refers to the DDIC activation phase. While parallelization affects this, benchmarking specifically targets the conversion and migration of application data, which is typically the most time-consuming part of the downtime.

References
SAP Training ADM328 (SAP S/4HANA Conversion and SAP System Upgrade): Section on "Downtime Optimization" and "SUM Benchmark Tool."
Question 10 Choose 2
You performed a custom code check for an SAP S/4HANA conversion. In which transactions can you review the results?

There are 2 correct answers to this question.
Show answerHide answer

Correct answer: C, D ATC (ABAP Test Cockpit)SE80 (Object Navigator)

Explanation

Explanation:

For an SAP S/4HANA conversion, the standard tool for custom code checks is the ABAP Test Cockpit (ATC) with the S/4HANA Readiness Check check variant. The results are centrally managed and reviewed within the ATC framework.

C. ATC (ABAP Test Cockpit):
This is the primary transaction for reviewing custom code check results. It provides a comprehensive worklist, allows filtering by priority/object/check, and facilitates mass processing of findings. The ATC results show S/4HANA-specific simplification items, syntax errors, and compatibility issues.

D. SE80 (Object Navigator):
You can also review results in context within SE80. By navigating to a specific development object (program, class, etc.), you can display its ATC check results directly, which is useful for object-by-object analysis and correction.

Why the other options are incorrect:

A. SYCM (Simplification Database Content):
This transaction is used to browse the SAP Simplification List – the catalog of changes and deletions in S/4HANA. It is a reference tool, not for reviewing custom code check results.

B. SAT (Runtime Analysis):
This is a performance profiling tool used for performance optimization, not for static code checks or S/4HANA compatibility analysis.

Reference:
SAP Help Portal: "Custom Code Migration for SAP S/4HANA" and SAP Note 2183564 (Custom Code Migration Option in SAP S/4HANA) specify that the ATC is the central tool for managing the results of the S/4HANA Readiness Check for custom code. Integration with the development environment (SE80) allows direct navigation from findings to the source code.
Full mock exam

Sit the E_S4HCON2023 exam before exam day

Full-length mocks with the same number of questions and the same time limit as the real E_S4HCON2023 exam. Every attempt draws a new set of questions from the full bank, so you can keep going until you pass comfortably.

Get full E_S4HCON2023 mock exam
  • 40questions per mock
  • 90 mintime limit
  • 79questions in the bank
  • Newmock on every attempt
This practice test covers S/4HANA conversion topics: system preparation, technical conversion, data migration, and post-conversion activities. You will practice questions on SUM (Software Update Manager), DMO (Database Migration Option), customization analysis, and validation strategies. The test emphasizes how to execute successful system conversions with minimal disruption. By working through these focused questions, You will validate your ability to manage complex technical migrations—preparing you to lead organizations through their journey to S/4HANA.

What it is:

A globally recognized specialist-level certification from SAP that validates your advanced technical knowledge and practical skills in SAP S/4HANA system conversion and SAP system upgrade projects, demonstrating your ability to plan, execute, and manage technical conversion and upgrade activities from SAP ECC to SAP S/4HANA and across SAP system landscapes.

Exam details:

Exam code: E_S4HCON2023
Duration: 180 minutes (3 hours)
Number of questions: 40 (multiple-choice/multiple-answer)
Passing score: Approx. 65–70%
Level: Specialist (for experienced SAP Basis and technical consultants involved in system conversion and upgrade projects)

What it covers:

SAP S/4HANA Conversion Overview: Understanding system conversion approach, project phases, prerequisites, and technical planning.
System Preparation & Readiness: Simplification Item Catalog, Custom Code Adaptation, Maintenance Planner, and SAP Readiness Check.
Technical Conversion Execution: SUM-based conversion steps, downtime optimization, and system migration procedures.
Custom Code & Data Adaptation: Handling custom code remediation, data consistency checks, and functional adjustments for SAP S/4HANA.
SAP System Upgrade Concepts: Upgrade strategies, enhancement packages, and technical upgrade execution using SAP tools.
Testing & Validation: Technical testing, functional validation support, and error handling during conversion and upgrade cycles.
Post-Conversion Activities: Optimization, system stabilization, performance checks, and go-live support activities.
Tools & Best Practices: Using SAP tools such as SUM, SPAM, Maintenance Planner, and applying SAP-recommended best practices for successful conversions.