Show answerHide answer
Correct answer: A Reverse auction
Explanation
Explanation:In SAP Ariba, Overtime is a rule that extends the bidding period if a qualifying bid is submitted within a specified number of minutes before the event's scheduled end time.
Reverse Auction (English Format):
This is the classic competitive bidding environment. Because suppliers are actively trying to outbid one another, it is common for a "bidding war" to occur in the final seconds. Overtime rules are essential here to ensure the buyer gets the absolute best market price and to prevent a supplier from winning simply because they had the fastest internet connection at the 59th second.
How it works:
If you set the "Start overtime period if bid submitted within" to 5 minutes, any bid placed at the 4:59 mark will reset the countdown clock (e.g., back to 5 or 10 minutes), allowing other suppliers to respond.
Why Other Options are Incorrect:
B (Dutch Auction):
In a Dutch auction, the price moves automatically (up or down) at fixed intervals. The first supplier to "accept" the price wins immediately. There is no "counter-bidding," so there is no need for overtime.
C (Simple RFX):
While an RFP (Request for Proposal) can be extended manually by a project owner, it does not typically use the automated "Overtime" rule logic found in live auctions. RFPs are usually set with a firm deadline for submission.
D (Japanese Auction):
In a Japanese auction, suppliers must accept a price level to stay in the round. If they don't accept, they are out. The rounds are timed, and the system moves to the next price level automatically. Like the Dutch format, the logic of "outbidding at the last second" doesn't apply in the same way, and SAP Ariba disables the overtime option for this format.
Reference:
This is covered in the Sourcing Event Management Guide under the Auction Formats section. A key exam takeaway is that Dutch and Japanese auctions are "Serial" events by nature and do not support Overtime, whereas Reverse (English) auctions do