SAP certification · Exam C_ARCIG_2404

C_ARCIG_2404 Mock Exam Page 2

SAP Certified Associate - Implementation Consultant - Managed gateway for spend management and SAP Business Network

Free C_ARCIG_2404 mock exam questions 11–20, each with the answer and an explanation.

20 questions · 45 minutes · free, no sign-up

Free C_ARCIG_2404 questions

11–20 of 24 free
Question 11 Choose 2
Which document types in CiG require the ARBCI2 software component? Note: There are 2 corec answers to this question.
Show answerHide answer

Correct answer: A, C QuoteMessageContractServicesContractRequestServices

Explanation

Explanation:

In the evolution of SAP Ariba integration, different software components handle different document sets. The ARBCI2 component is specifically designed to support Services and Sourcing integration scenarios.

A. QuoteMessageContractServices:
This document type is used in the integration of Sourcing awards into backend Service Contracts. Since it involves complex service hierarchies (Service Entry Sheets, service lines), it requires the enhanced processing capabilities found in the ARBCI2 component.

C. ContractRequestServices:
Similar to the above, when a contract request is initiated from SAP Ariba that includes service-related data (Service Specifications), the ARBCI2 component provides the necessary structures to map these into the SAP ERP/S4HANA backend.

Why Other Options Are Incorrect

B. QuoteMessageOrder:
This document type (standard sourcing award to a Purchase Order) is typically handled by the ARBCI1 software component. ARBCI1 is the "base" component for standard procurement documents like POs, Receipts, and Invoices that do not involve complex service specifications.

D. Contract Request:
A standard, material-based Contract Request (without the "Services" suffix) is also managed under the ARBCI1 component. Only when the "Services" specific logic is required does the system trigger the need for ARBCI2.

References
SAP Help Portal: SAP Ariba Cloud Integration Gateway Configuration Guide, section on "Downloading and Installing the SAP Ariba Cloud Integration Add-on."
Question 12 Choose 1
What is the maximum number of fields that can be concatenated using the custom mapping?
Show answerHide answer

Correct answer: C 3

Explanation

Explanation:

In the custom mapping configuration within CIG (often configured in the Value Mapping or Custom Field Mapping sections of an iFlow), the system allows you to combine multiple source fields into a single target field using concatenation. The platform imposes a technical limit on how many source fields can be joined together in a single concatenation operation.

C. 3 is correct because:
The CIG configuration interface for field concatenation typically provides three input fields for source values when defining a concatenation rule.
This limit is designed to balance flexibility with system performance and mapping complexity.

Why the other options are incorrect:

A. 4 - Incorrect.
While concatenation of 4 fields might be desirable in some scenarios, it exceeds the configured maximum in the standard CIG mapping tools.

B. 2 - Incorrect.
The system allows more than two fields to be concatenated (specifically, up to three), so this answer understates the capability.

D. 5 - Incorrect.
This exceeds the technical limit imposed by the CIG platform. For requirements needing more than 3 fields, alternative approaches (like backend preprocessing or additional iFlow steps) would be necessary.

Reference
CIG Configuration Guide - Custom Field Mapping: Documents the limitation on concatenation operations during integration flow design.
Question 13 Choose 3
Which of the following integrations do you need to define RFC destination for? Note: There are 3 correct answers to this question.
Show answerHide answer

Correct answer: A, B, E Ariba Network ReceiptAriba Network Order ConfirmationAriba Network Purchase Order

Explanation

Explanation:

In the context of SAP Ariba Cloud Integration Gateway (CIG), an RFC destination is configured in the SAP backend system (ERP/S/4HANA) to enable outbound communication from SAP to Ariba Network. This is specifically for scenarios where SAP initiates the document transfer.

A. Ariba Network Receipt is correct.
When goods/services are received in SAP, the system creates a receipt (Goods Receipt - GR) that typically needs to be sent to Ariba Network. This is an outbound process from SAP, requiring an RFC destination to transmit the receipt document.

B. Ariba Network Order Confirmation is correct.
When a supplier confirms a purchase order in Ariba Network, that confirmation must be sent back to SAP. However, from SAP's perspective, receiving this confirmation is often triggered by SAP polling Ariba Network or Ariba pushing it to an SAP endpoint. The initial outbound PO and the mechanism to receive confirmations typically involve RFC destinations for the SAP-to-Ariba connection setup.

E. Ariba Network Purchase Order is correct.
When a purchase order is created in SAP, it needs to be sent to Ariba Network for supplier collaboration. This is a classic outbound integration from SAP, which requires an RFC destination to establish the connection to Ariba's cloud services.

Why the other options are incorrect:

C. Ariba Sourcing RFQ is incorrect.
Integration with Ariba Sourcing typically uses different technical methods. RFQ creation usually originates in Ariba Sourcing and flows into SAP (for item/cost center validation), not as an outbound RFC call from SAP. The primary integration for Sourcing often uses web services or OData services rather than traditional RFC destinations configured in SM59.

D. Ariba Sourcing Article Master Data is incorrect.
Master data replication (like articles/materials) from SAP to Ariba Sourcing is usually handled through extraction jobs or replication services that use HTTP/SOAP or OData connections, not traditional RFC destinations. The modern CIG architecture uses cloud-based integration rather than direct RFC calls for master data sync to sourcing solutions.

Reference:
CIG Connection Configuration: RFC destinations (transaction SM59) are primarily configured for Ariba Network document exchange (cXML messages for POs, Confirmations, Receipts, Invoices).
Question 14 Choose 1
You are defining an RFC destination for Aiba Network Integration in direct connectivity deployment.

What path prefix should you use in technical settings?
Show answerHide answer

Correct answer: D /cxf/receiveANIDOC

Explanation

Explanation:

In a Direct Connectivity deployment—where the SAP ERP system communicates directly with the SAP Business Network (formerly Ariba Network) via the Managed Gateway—the RFC destination (typically type 'G' or 'H') must be configured to point to the correct endpoint listener.

Purpose of the Prefix: The path prefix acts as the specific "mailbox" address on the Managed Gateway that is listening for incoming IDocs from the SAP backend.

Why D is correct:
/cxf/receiveANIDOC is the standard, hardcoded endpoint used specifically for Ariba Network IDocs. When the SAP system triggers an outbound IDoc (like an Order Confirmation or Advanced Shipping Notice), it sends the data to the Managed Gateway URL followed by this specific path.

Component Role: This path ensures the Managed Gateway's Integration Flow (iFlow) correctly identifies the incoming payload as an IDoc intended for the Business Network rather than Master Data or a different Ariba module.

Why Other Options Are Incorrect

A. /cxf/receiveERPiDOC:
This is a common distractor. While it looks technical, it is not the standard endpoint defined in the SAP Ariba integration documentation for AN (Ariba Network) traffic.

B. /cxf/receivelDoc:
This is too generic. The Managed Gateway requires the "AN" (Ariba Network) identifier in the string to route the document through the correct business logic.

C. /cxf/receiveERPMD:
The "MD" suffix stands for Master Data. This path is used specifically when replicating master data (like accounting or user data) using the Master Data framework, not for transactional IDocs.

References:
SAP Help Portal: SAP Business Network Integration Guide for SAP ERP, section on "Configuring the RFC Destination."
Question 15 Choose 1
For which of the following transactions would you need to create a partner profile manually in Ariba Network Integration via CIG?
Show answerHide answer

Correct answer: B Payment Remittance

Question 16 Choose 2
What types of contracts are supported in SAP Ariba Strategic Sourcing integration via CIG?
Note: There are 2 correct answers to this question.
Show answerHide answer

Correct answer: C, D WKMK

Question 17 Choose 3
Which of the following parameters are relevant in SAP ERP for catalog upload request integration via the SAP Ariba Cloud Integration.

Note: There are 3 correct answers to this question.
Show answerHide answer

Correct answer: A, C, D BUYER_CAT_CLASS_TYPEBUYER_CAT_CLASSBUYER_CAT_INT_CHAR_NO

Question 18 Choose 3
You are migrating from Ariba Ci to the Sap Ariba Cloud Integration Gateway solution. Which of the following transactions are considered in the "Migrate transaction configuration" automated report? Note: There are 3 correct answers to this question.
Show answerHide answer

Correct answer: A, C, E Purchase Order in SAP Ariba Procurement IntegrationQuote Message/Award in Quote Automation IntegrationRequisition in SAP Ariba Procurement Integration

Question 19 Choose 2
Which options in the Interface Setup program are associated with outbound interfaces from SAP ERP to Cloud integration...

Note: There are 2 correct amswers to this question.
Show answerHide answer

Correct answer: A, C Supplier Lifecycle Performance Confrmation Out RequestSupplier Lifecycle Performance Outbound Request

Question 20 Choose 3
Which of the following are important fields in BASIC DATA? Note: There are 3 correct answers to this question.
Show answerHide answer

Correct answer: C, D, E Time ZoneAriba AddOn InfoSystem ID

Full mock exam

Sit the C_ARCIG_2404 exam before exam day

Full-length mocks with the same number of questions and the same time limit as the real C_ARCIG_2404 exam. Every attempt draws a new set of questions from the full bank, so you can keep going until you pass comfortably.

Get full C_ARCIG_2404 mock exam
  • 80questions per mock
  • 180 mintime limit
  • 82questions in the bank
  • Newmock on every attempt