Show answerHide answer
Correct answer: B Add explicit plugin version tracking to the project's configuration so the team can identify, pin, and upgrade plugin versions deliberately.
Explanation
ExplanationThe root cause is stated plainly: the team had not been tracking plugin versions, so after a regression they cannot identify which version was previously working. The direct fix is to introduce explicit version tracking in configuration — record the version of every plugin each application depends on, pin known-good versions, and upgrade deliberately (with the ability to roll back to the last working version). This restores the missing capability: reproducibility and the ability to diagnose a regression by comparing pinned versions. Pinning also prevents silent regressions from future updates. ✅
Why the other options are incorrect
A — Abandon all plugins and rebuild functionality in-house: This is a massive, costly overreaction that eliminates the benefit of plugins entirely. The problem is untracked versions, not plugins as such; avoidance trades a small process fix for a large engineering burden.
C — Treat plugins as "untrackable" and offload responsibility to authors: This repeats the practice that caused the incident. Relying on upstream communication with no internal tracking means you still can't identify your last-known-good version.
D — Upgrade everything on a regular cadence: This increases exposure to regressions because every update is a change, without giving you the ability to identify or pin a working version. Keeping drift small doesn't substitute for tracking versions.
References
- Dependency/version management best practices — pin known-good versions, track manifests, enable deliberate upgrades and rollback.