Based on the image content you've provided, I need to make some logical assumptions since the full question context isn't visible. The image shows two configuration sections:
Global release settings:
Default retention policy: 30 days
Maximum retention policy: 30 days
Stage retention policy: Two options (30 days and 60 days)
Production stage settings:
Default retention policy: 30 days
Maximum retention policy: 60 days
Stage retention policy: Two options (30 days and 60 days)
From typical Azure DevOps release retention policy configuration:
Answer:
For Global release:
Default retention policy: 30 days
Maximum retention policy: 30 days (maximum cannot exceed global maximum)
For Production stage:
Default retention policy: 30 days (inherits from global)
Maximum retention policy: 60 days (can exceed global maximum for production)
Stage retention policy: 60 days (since production typically needs longer retention)
Explanation:
In Azure DevOps, retention policies can be set at both global and stage levels. The production stage often requires longer retention for compliance or rollback purposes, so it makes sense to set it to 60 days while keeping other stages at 30 days. The production stage can have a higher maximum than the global setting for critical environments.