Question 11 Choose 1
A rolling release has incompatible old and new protocols. What should be fixed?
Show answerHide answer

Correct answer: D Compatibility during mixed-version operation

Explanation

Answer Option (Which option is correct) D. Compatibility during mixed-version operation
Explanation:

A rolling update permits old and new versions to run at the same time. Their protocols must remain compatible for requests that cross version boundaries. Use a staged compatibility change or another suitable rollout plan instead of assuming all peers update simultaneously.

Why the other options are incorrect:

A. Only the branch name:
The branch name does not change network protocol behavior. Old and new instances can still reject each other's requests. Mixed-version compatibility must be designed and tested.

B. Only the artifact title:
The artifact title is descriptive metadata. Renaming it does not repair incompatible interfaces. The actual inter-version contract needs correction.

C. Only the DNS TTL:
DNS TTL affects address cache duration. It does not guarantee protocol compatibility between versions. Interface behavior is the failure described.

References:

Kubernetes: deployments

AWS: deployment strategies
Question 12 Choose 1
Blue-green code rollback is fast but both versions share a database. What is critical?
Show answerHide answer

Correct answer: B Backward-compatible schema changes

Explanation

Answer Option (Which option is correct) B. Backward-compatible schema changes
Explanation:

Both deployment environments depend on the same database, so switching traffic does not undo a schema change. Keep the schema usable by the versions that may run during deployment or rollback. Validate that compatibility before relying on a quick blue-green traffic fallback.

Why the other options are incorrect:

A. A mutable latest tag:
A mutable tag can point to changing code. It does not preserve compatibility with the shared schema. Known versions still need backward-compatible database changes.

C. No database tests:
Skipping database tests removes evidence about schema compatibility. The old application may fail after rollback. Test both application versions against the staged schema.

D. Identical dashboard colors:
Dashboard colors are visual presentation. They do not affect database compatibility. The recovery constraint concerns code and schema behavior.

References:

AWS: deployment strategies

That's the last free question in Continuous Delivery

You've seen the free 30% (12 of 42 questions). Full access unlocks every question and full-length AT0-001 mock exams (60 questions, 60 minutes), a different mock on every attempt.

Unlock full mock exam
Full mock exam

Sit the AT0-001 exam before exam day

Full-length mocks with the same number of questions and the same time limit as the real AT0-001 exam. Every attempt draws a new set of questions from the full bank, so you can keep going until you pass comfortably.

Get full AT0-001 mock exam
  • 60questions per mock
  • 60 mintime limit
  • 211questions in the bank
  • Newmock on every attempt