Question 1 Choose 1

During a boot process of a Cisco UCS C-Series Rack Server, an engineer receives a "No
Signal" message from the vKVM and physical connection. Which set of steps resolves the
issue?

Show answerHide answer

Correct answer: B

1- Power off the server and disconnect the power cord
2- Confirm that all cards are property seated
3- Connect the power cord and power on the server

Explanation

Question 2 Choose 1

A server administrator attempts to change the Cisco IMC KVM certificate to one signed by
a private CA, but the certificate is not being accepted. What can cause this process to fail?

Show answerHide answer

Correct answer: A

using a certificate with a password-protected private key

Question 3 Choose 1

An engineer enables the packet postcards feature on a Cisco Nexus 9000 Series Switch
but receives the error message "Error: Cannot configure postcard when inband-telemetry is
configured."
Which action resolves the issue?

Show answerHide answer

Correct answer: C

Disable the hardware-telemetry feature

Explanation

Explanation:
https://www.cisco.com/c/en/us/td/docs/switches/datacenter/nexus9000/sw/93x/progammabi
lity/guide/b-cisco-nexus-9000-series-nx-os-programmability-guide-93x/b-cisco-nexus-9000-
series-nx-os-programmability-guide-93x_chapter_0101011.htm

Question 4 Choose 1

Refer to the exhibit.

A new Cisco Nexus 5548 Switch connects to a network. SAN switching is configured on the
switch. The switch fc2/10 NP uplink is shown in the exhibit. Which action ensures that
fc2/10 is in an up state?

Show answerHide answer

Correct answer: C

Enable NPIV on the upstream switch that connects the port.

Question 5 Choose 1

An engineer is troubleshooting a packet flow from an access leaf to spine. Which EVPN
routes are expected on this connection?

Show answerHide answer

Correct answer: A

EVPN Type 1-5

Question 6 Choose 1

Refer to the exhibit.

A network engineer has connected the Nexus switch management port to the Internet
using DHCP to allow the Guest shell running on the switch to download Python packages.
The engineer can ping google.com successfully from the Nexus switch, but the Guest shell
failed to download any Python packages. Which action resolves the problem?

Show answerHide answer

Correct answer: B

Manually configure DNS in the Guest shell, even if it is claimed on the Cisco Nexus
switch through DHCP.

Question 7 Choose 1

An engineer discovers that an NPV/NPIV uplink experiences a heavy load and plans to add
more uplinks. Which statement about what occurs when the new uplinks are added is true?

Show answerHide answer

Correct answer: D

New and existing connections use the new uplinks automatically.

Question 8

Drag and drop the actions from the left onto the faults that they resolve on the right. Not all
options are used.

Show answerHide answer

Explanation

Question 9 Choose 1

One of Cisco Nexus Series interfaces has become errdisabled with the error message
“DCX-No ACK in 100 PDUs”. What is the cause of this error?

Show answerHide answer

Correct answer: B

The acknowledgement number in the server response has not incremented for 100
exchanges.

Question 10 Choose 1

Refer to an exhibit.

An engineer is troubleshooting an upgrade failure on a switch. Which action resolves the
issue?

Show answerHide answer

Correct answer: C

Load a new system image.

Full mock exam

Sit the 300-615 exam before exam day

Full-length mocks with the same number of questions and the same time limit as the real 300-615 exam. Every attempt draws a new set of questions from the full bank, so you can keep going until you pass comfortably.

Get full 300-615 mock exam
  • 65questions per mock
  • 105 mintime limit
  • 81questions in the bank
  • Newmock on every attempt

Cisco 300-615 Exam Details


Exam Code: 300-615
Exam Name: Troubleshooting Cisco Data Center Infrastructure (DCIT) br>Certification Name: CCNP Data Center
Certification Provider: Cisco
Exam Questions: 55–65 questions
Exam Time: 90 minutes
Passing Score: Variable 750-850 / 1000