Cisco certification · Exam 300-110

300-110 Mock Exam Page 2

Designing Cisco Wireless Networks (300-110 WLSD) v1.2

Free 300-110 mock exam questions 11–20, each with the answer and an explanation.

20 questions · 44 minutes · free, no sign-up

Free 300-110 questions

11–20 of 27 free
Question 11 Choose 1
Which CLI command does an engineer use to validate that the redundancy peer of a Stateful Switchover pair of controllers is up and connected?
Show answerHide answer

Correct answer: C eping

Question 12 Choose 1
Multiple WLCs are implemented in a high-availability configuration in a mobility group. APs are deployed with only a primary controller assigned. By default, which mobility group member controller do the orphaned APs join in the event of a failed controller?
Show answerHide answer

Correct answer: B controller with the lowest percent of associated APs per license capacity

Question 13 Choose 1
In a FlexConnect deployment, which role does the site tag play?
Show answerHide answer

Correct answer: D It defines the roaming domain for FlexConnect APs.

Question 14 Choose 1
A network engineer must design a new wireless solution for a company, but the budget can only stretch to include a single Cisco 9800-40 WLC. The company requires high availability between the WLC and the core switch in the event of a cable failure. The WLC must dynamically manage port redundancy and perform load balancing between APs transparently. Which design approach must the engineer take to meet the requirements?
Show answerHide answer

Correct answer: A LAG

Question 15 Choose 1
A customer is migrating from a legacy Cisco AireOS WLC to a new Cisco 9800 IOS XE WLC with Cisco 9100 APs. The new APs must associate to the Catalyst 9800 WLC, and wireless clients must seamlessly roam between the old and new WLCs even during SSO. The new Catalyst 9800 WLC deployment is configured to use SSO. Which command must be added to meet the requirements?
Show answerHide answer

Correct answer: C C9800# wireless mobility mac-address < MAC >

Question 16 Choose 2
An engineer must assess an existing company WLAN to determine the possibility for future IEEE 802.11ac Wave 2 wireless deployment. All access switches are Fast Ethernetcapable only, and the wired infrastructure between existing APs and access switches is based on the CAT 6A standard. Which two actions provide maximum support of Cisco 3800 Series access points? (Choose two.)
Show answerHide answer

Correct answer: A, B Replace the existing switches with mGig switches.Replace the existing switches with gigabit switches with 10G uplinks.

Question 17 Choose 1
A university has three campus locations and the main data center. Each campus location has a Cisco Catalyst 9800-40 WLC that manages 600 APs. The data center has a Catalyst 9800-40 WLC, which serves as N+1 backup for each campus WLC. A consulting engineer must install four additional Catalyst 9800-40 WLCs to serve as high availability SSO pairs for each campus, but only two have been approved due to budget restrictions. Requirements: Data center WLC must always be available as N+1 backup, Campus1 WLC must operate with zero downtime, and in the event of multiple campus outages, the AP priority order is to support Campus3, Campus2, then Campus1. Which design approach must the consulting engineer take?
Show answerHide answer

Correct answer: C The data center WLC and Campus1 WLC are the high availability SSO pair. Campus3 APs have priority 4, Campus2 APs have priority 2, and Campus1 APs have priority 1.

Question 18 Choose 2
An engineer is designing a solution where guests terminate on an anchor controller in the DMZ. The engineer is having issues and wants to test connectivity between members of a mobility group. Which two steps must be performed to test whether a mobility control packet can be reached over the management interface? (Choose two.)
Show answerHide answer

Correct answer: A, C Use the mping command on both WLCs.Open UDP port 16666 between both WLCs.

Question 19 Choose 1
An engineer is designing a wireless network in a historic building that has large rooms and ornate wall coverings. Which approach must be considered first when placing access points?
Show answerHide answer

Correct answer: B RF coverage

Question 20 Choose 1
A community bank has three campus locations and one HQ with the data center. Each campus has four Cisco Catalyst 9120 APs. Poor WAN uplinks cause impacted connectivity back to HQ, and each campus is planned to have its own EWC controller based on C9120 AP to keep traffic local. Guest WLAN will be routed locally. Employee WLAN must be authenticated 802.1x PEAP via HQ ISE but can pass traffic locally once authenticated. HQ WLC will be the primary backup WLC for each WLC. Which design approach should the consulting engineer take?
Show answerHide answer

Correct answer: A One C9120 AP in each campus must be converted to EWC mode, and the preferred controller is set to that AP with HQ WLC set as N+1 backup. The campus guest WLAN will use local web auth on guest VLAN, and employee WLAN will need the HQ AAA server to be added to EWC.

Full mock exam

Sit the 300-110 exam before exam day

Full-length mocks with the same number of questions and the same time limit as the real 300-110 exam. Every attempt draws a new set of questions from the full bank, so you can keep going until you pass comfortably.

Get full 300-110 mock exam
  • 55questions per mock
  • 120 mintime limit
  • 93questions in the bank
  • Newmock on every attempt