Oracle certification · Exam 1z0-083

1z0-083 Mock Exam Page 3

Oracle Database Administration II

Free 1z0-083 mock exam questions 21–28, each with the answer and an explanation.

20 questions · 33 minutes · free, no sign-up

Free 1z0-083 questions

21–28 of 28 free
Question 21 Choose 3

Which three are true about Automatic Workload Repository (AWR)? (Choose three.)

Show answerHide answer

Correct answer: A, B, D

By default, AWR snapshots are taken every 60 minutes.

Its collection level is determined by the value of theSTATISTICS_LEVEL database parameter

The taking of AWR snapshots can be disabled.

Question 22 Choose 2

Which two are true about RMAN duplexed backup sets? (Choose two.)

Show answerHide answer

Correct answer: D, E

A non-duplexed backup set written to disk can be duplexed to tape by backing upthe backup set that is
already on disk.

A non-duplexed backup set written to SBT can be duplexed to disk by backing up the backup set that is
already on tape.

Question 23 Choose 2

You are managing this configuration:
CDB1is a container database.
PDB1andPDB2are two pluggable databases inCDB1.
USER1.EMPis a table inPDB1andUSER2.DEPTis a table inPDB2.
CDB1userSYSexecutes these commands after connecting successfully toPDB2:

Which two are true? (Choose two.)

Show answerHide answer

Correct answer: D, E

The insert on USER2.DEPT is a recursive autonomous transaction by the child session and is
committed.

The inserts on USER1.EMP were rolled back when the session connected to PDB2.

Question 24 Choose 1

Examine this configuration:

What will be the outcome?

Show answerHide answer

Correct answer: C

It will re-create ‘/u02/app/oracle/fast_recover_area/cdb1/CDB1/controlfile02.ctl’

Question 25 Choose 3

Which three are true about Oracle Grid Infrastructure for a Standalone Server?

Show answerHide answer

Correct answer: A, B, D

It includes both Oracle Restart and OracleAutomatic Storage Management (ASM) software.

It creates one disk group during installation.

It requires Oracle ASM Filter Driver (ASMFD) to manage Automatic Storage Management (ASM)
disks

Question 26 Choose 1

Examine this configuration:
1.The ORCL database data files are in Automatic Storage Management (Oracle ASM) disk group +DATA.
2.ORCL uses disk group +FRAfor the Fast Recovery Area.
3.LISTENER is the listener for ORCL.
4.The database, listener, ASM instance, and ASM disk groups are managed by Oracle Restart.
5.All components are currently shut down.
You execute this command:

What is the outcome?

Show answerHide answer

Correct answer: D

Only the ORCL database instance, the Oracle ASM instance, and the +DATA and +FRA disk groups
are started.

Question 27 Choose 2

Which two are true about Rapid Home Provisioning (RHP), which has been available since Orcale 18c?
(Choose two.)

Show answerHide answer

Correct answer: D, E

It can be used to patch Grid Infrastructure homes containing Oracle Restart.

It can be used to provision middleware.

Question 28 Choose 3

Which three are true about upgrading Oracle Grid Infrastructure? (Choose three.)

Show answerHide answer

Correct answer: D, E, F

The upgrade process will automatically install all mandatory patches for the current version of Oracle
Grid Infrastructure.

Existing Oracle Database instances must be shut down before starting the upgrade.

Only the grid user can perform the upgrade.

That's the last free question

You've seen the free 30% (28 of 96 questions). Full access unlocks every question and full-length 1z0-083 mock exams (65 questions, 105 minutes), a different mock on every attempt.

Unlock full mock exam
Full mock exam

Sit the 1z0-083 exam before exam day

Full-length mocks with the same number of questions and the same time limit as the real 1z0-083 exam. Every attempt draws a new set of questions from the full bank, so you can keep going until you pass comfortably.

Get full 1z0-083 mock exam
  • 65questions per mock
  • 105 mintime limit
  • 96questions in the bank
  • Newmock on every attempt